28.
Attach walls to floor now. Prior to attaching,
check wall and floor alignment. Bottom wall
framing should sit flush with outside of floor joists
with siding overhanging. See
Steps 15-20
for
correct alignment.
Confirm Door Jambs are 64” apart at top and
bottom of door opening.
Fasten bottom wall plates to floor using
4 - 2 1/2”
screws (Part B)
per wall panel.
Bottom Wall
Framing.
Confirm 64” Wide between Door Jambs
Caulking
Optional
- Caulking
seams will help prevent
moisture from entering at
seam.
Caulking not included in
kit.
26.
Complete remaining Side and Rear Top Plate
attachments as per
Steps 24-25.
Angle
screws into perimeter
Floor Joists.
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 14
27.
Attach front
Front Triangular Corner
Brackets - 1 1/2” x 5 1/2” x 5 1/2”
(Part 2G)
to header and wall frame with
2 - 2 1/2” screws (Part B)
per piece.