Page 20
45.
Carefully pickup and position
outside panel on rafters. Place panel
so it sits flush on 3rd rafter from the
outside (doubled up rafter). Plywood
on roof should be flush with end of
rafter at bottom, and with seam of
doubled up rafters.
46.
Screw panel down with
1 - 2 1/2” screws (Part B).
Bottom and top row of shingles only.
44.
Carefully flip
Roof Panels (Parts 3E & 3F)
over so plywood sheathing is facing up. Attach
one
Roof/Facia Cleat - 3/4” x 1 1/2” x 42”
(Part 3G)
onto outside of each outside panel
flush with plywood. Attach with
4 - 1 1/4” Screws
(Part C)
evenly spaced. Attach remaining cleats
to panels. The cleat provides for a greater
nailing surface later when you attach side facia.
Roof Plywood flush
with rafter end
1 screw at
bottom row of
shingles only
43.
The
Roof Gusset 1- 3/4” x 3 1/2” x 48” (Part 3D)
is positioned on center rafter. Use level
to square gusset and attach to rafter with
4 - 1 1/4” screws (Part C)
.
Pilot hole Gusset to prevent
splitting.
If we required, have a helper(s) push at the front and at the rear near the top of the walls
from the outside of shed until inside to inside measurement between the top plates is
70”
before
attaching.
70”