19.
Align wall panel framing as per
Step 18
. The wall panel framing with sit flush with floor framing as
shown above. Attach vertical wall frames together as per
Step 18.
20.
Position and attach remaining side wall panels together as per
Steps 16-18.
Rear
Wall panel
framing aligned
flush with floor
framing
Side
Floor
Framing
Rear
W
all
18.
Align vertical wall frames of both side wall panels together and attach with
3 - 2 1/2” screws (Part B).
Locate and position the 2nd rear wall panel into place.
Rear
W
all
Panels
Side W
all Panels
Side
Wall
Panels
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
Gap
2nd
Rear
Wall
Panel