Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
19.
Locate Triangular Gable Panel. Position
over Gables. Siding on bottom of Gable Panel will
overhang Side Wall Panel as shown above.
Secure with
6 - 1 1/4” screws
.
Hardware
S2
- 1 1/4” Screws
x 4 total
Parts
7A - Triangular Gable Panel
L/R
(45”w x 18”)
x 1
Pre-drill siding
with 1/8” drill bit
20.
Locate remaining Triangular Gable Panels.
Position over Gables. Secure panels with
6 - 1 1/4” screws
. as per
Step 19
on both sides.
Hardware
S2
- 1 1/4” Screws
x 12 total
Parts
7A - Triangular Gable Panel
L/R
(45”w x 18”)
x 3
21.
To accomodate Interior Door Plywood, the existing top plate on bottom door must be removed
first. Using a hammer, carefully pry off the top plate and remove any hardware.
Pre-drill siding
with 1/8” drill bit