43.
Locate 2
Outside Roof Battens
and
1
Inside Roof Batten
. Place Battens on top of
Rafter section where Rafters and Ridge Boards
meet. Batten will overhang outside Rafter by 2 1/2”.
Parts (Steps 43 - 48)
Outside Battens
(3/4” x 3 1/2” x 48”)
x 20
Inside Battens
(3/4” x 3 1/2” x 45 1/2”)
x 10
Parts (Steps 43 - 48)
Batten Spacers
(3/4” x 1 1/2” x 15 3/4”)
x 16
Hardware (Steps 43 - 48)
S2
- 1 1/4” Screws
x 112 total
D. Roof Section
Metal Ridge Caps (3)
Metal Roof Panels
Long - 86” (8)
Roof Battens Outside
48” long (20)
Roof Battens Inside
45 1/2” long (10)
Foam Enclosures
(Several)
Batten Spacers
15 3/4” long (16)
2 1/2”
Flush to Ridge Board
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 28
Metal Roof
Hangers (4)