49.
Locate all
Metal Roof Panels
and
Metal Roof Hangers
. To
temporarily help hold the
Metal Roof Panel Long
in place, hook a
Metal Roof Hanger
onto the lower
Batten
approximately where the
center of the first panel will be. Place the first
Metal Roof Panel Long
on
Battens
. Do not fasten Panels down until
Step 54
. place remaining
Metal Roof Panels
on Hangers the same way.
Parts (Steps 49 - 54)
Metal Roof Panels Long
(86” long)
x 8
Hardware (Steps 49 - 54)
2” - Metal Roof Screws
x 60 total
Hardware (Steps 49 - 54)
Metal Roof Hangers
x 4
total
Metal Roof Panels overlap each other
50.
Metal Roof Panels
overhang on the side of shed should be approximately 4” and is set by
Metal
Roof Hangars
. Overall width past the end of
Battens
on front and rear can vary from
1” - 3” depending on your personal preferences The
Metal Roof Panels
have room to space out to
achieve desired overhang.
4”
1” - 3” of overhang past
the battens.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 31