8.
With
Floor Plywood
pieces in position, attach
with 1 1/4” screws
. Use screws every 16”
(approximately 90 total). The plywood is cut slightly smaller than floor framing. Keep plywood seams
tight.
Hint:
Use a chalk
line to mark location
of floor joists to
determine screw
placement.
Important:
Check to confirm that your
floor is level prior to proceeding to the
next step of wall assembly.
141 1/2”
182”
Front of Shed
B. Wall Section
Solid Wall Panels (9)
1 with 2 extra studs
Side Riser Plates (4)
Side Top Plates (6)
Gable Half Walls (4)
F&R Riser Plates (4)
F&R Top Plates (6)
Narrow Window
Wall Panel (2)
Door Jambs (2)
Door Header Riser (1)
Door Header w/ Spacers (1)
Drip Edge w/ Bevel Siding (1)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11