67.
Close both doors and align so doors are
straight. Attach
Door Threshold
with
4 - 2” Screws
, centering between doorway.
Parts (Step 67)
Door Threshold
(3/4” x 2 1/2” x 62 1/2”)
x 1
Hardware (Step 67)
S3
- 2” Screws
x 4 total
68.
Position and attach
Vertical Door Flange
on
inside edge of door frame
(left door from outside)
using
6 - 2” Screws
.
Parts (Step 68)
Interior Door Flange
(1/2” x 2 1/2” x 71”)
x 1
Hardware (Step 68)
S3
- 2” Screws
x 6 total
69.
The Interior
Cane Bolt
will be attached to Vertical Door Flange. To
position Cane Bolt correctly, attach to flange first, close doors and mark
hole to house Cane Bolt Rod. Open doors and drill hole where previously
marked with 1/2” bit. Attach Cane Bolt with 3/4” black screws.
Hardware (Step 69)
Y6
- Cane Bolt
x 1 total
SB1
- 3/4” Black Screws
x 6 total
Drill 1/2” wide hole
to accomodate roof
of Cane Bolt.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 38