manualshive.com logo in svg
background image

02PLAY511511-V1

Length 

- 1835mm

Width 

- 1827mm

Height

 - 1882mm 

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

This building should be erected by 

two Adults.

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand  

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

Make sure you have a suitable base ready to erect your building 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are delivered pre-treated with a water based timber treatment 

however this only helps to protect during transit of your garden item. 

To 

validate your guarantee and for better protection against weathering

 it is 

highly recommended that you treat the garden building with a wood preserver 

within 3 months of assembly. This will need to be re-applied annually to ensure 

longevity of your building. Care must be taken when constructing the garden 

building that it is not touching the ground and is on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and 

annual treatment.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  The base should be slightly 

smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run off for water. It is also recommended 

that the floor be at least 25mm above the surrounding ground level to avoid flooding.

MADE IN GREAT BRITAIN

Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level.  We  
cannot accept responsibility for your safety whilst erecting or using this product. Children of any age should not be left to play unsupervised.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

WARNING: Only for domestic use

Not suitable for children under 36 month

To be used under direct supervision of an adult

Door gable

1

2

3

4

5

6

7

8

9

10

11

12

13

14

Plain gable

Small Roof x2

Window Side x2

Large Roof x2

Floor

Ply triangle

Window cross  x5

Fixing Kit

4x Window

shutters

3x Roof Purlin 1721mm

4x Cover Trim 1200mm

4x Fascia Board 540mm

4x Fascia Board 686mm

2x Roof Eave - 1835mm

Contents

Retain Instructions for future reference

Door

15

Отзывы: