115.
Picture above shows illustration of
completed Cupola on gazebo.
116.
Next, time to install
Filler Shingles
to
completely secure gazebo roofs and hide roof seams.
Starting on bottom row of shingles, push a Long Filler
Shingle (5 1/2” wide) underneath shingles directly
above it until end is flush with bottom shingles.
117.
With a 3” screw,
secure Roof Panel down
into Mid Rafter above
Exposure line. Screw both
left and right Roof Panels
down to Mid Rafters. Make
sure to screw into rafter
above the exposure line to
conceal screw.
118.
Slide in the next long
Filler Shingle and attach as per
Step 117.
Continue until top row.
On top row, slide in
Short Filler
Shingle
and attach with 3” screw
into Mid Rafter.
Important
- Work around the
gazebo making sure to slide in all
Filler Shingles and attach Roof to
Mid Rafter as per
Step 117.
Exposure
Line
119.
Locate all Gazebo
Ridge Caps
.
Place 1st Ridge Cap (undercourse) on roof
seam slightly overhanging roof end and attach
with 1 1/4” Shingle Nails. Use less desirable
looking Ridge Caps for the undercourse as it
will be covered almost completely by the next
Cap.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 35
1st shingle
Overhang roof by 1- 2”.