54.
Place and position 2nd Floor Panel
on Floor Joists. Position as per
Step 53.
2nd Floor Panel
55.
Place and position remaining Floor
Panels around the Floor Joists. Position
as per
Step 53.
8th Floor Panel.
56.
With all panels evenly spaced and
and in their correct position, secure
each panel down to floor joists with
8 - 2” screws per panel.
Note,
drill 1/8” pilot holes to prevent
splitting.
57.
Place the
2nd to Last Deck
Board
on Floor Joists and position
between joists. (14 1/8” long)
2nd to Last Deck Board
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 21