The installation checklist consists of the following checkpoints:
• Site Requirements defined in document Olink® Signature Q100 Site Requirements (1170) have been met
• No visible damage to shipment received
• Power cable and 96.96 Interface plate received
• Transport packing material and restraints removed as defined in Installation Procedure
• Olink Signature Q100 System power and boots up without errors
• Cooling fans at the instrument
s’
rear are operational
• Touchscreen responsive
• Shuttle ejects and retracts
• Time and Date has been set
• Installation Instrument Check Passed
Figure 39. Installation Instrument Check Passed
19