
10. Press
Eject
on the screen to extend the shuttle and then remove the blue tape securing the thermal stack.
Figure 35. Eject button
Figure 36. Shuttle packing tape
11. Press
Next
to retract the shuttle. The Testing System screen appears, and the Installation Instrument Check runs for
~10 minutes. Upon completion of testing the system, the
Installation Checklist
appears.
Verify all items in the
checklist and check all the boxes to confirm
essential
instrument condition and functionality.
NOTE:
If self-diagnostics fails, re-run a second time again. If the self-diagnostics fails again, please contact Olink
support.
AUTION:
C
PINCH HAZARD. The instrument door and tray can pinch your hand. Make
sure your fingers, hands, and shirtsleeves are clear of the door and tray when loading or
ejecting a chip.
Figure 37. Testing System
Figure 38. Installation Checklist
18