3. Reinstall the top panel by sliding it forward.
Figure 21. Top panel installation
4. Tuck the front of the top panel between the tabs so that the panel seam closes.
Figure 22. Top panel in place and seam closed
5. Tighten the two captive screws at the right rear of the instrument panel (no tools are needed).
6. Re-attach the two Phillips screws at the rear of the top panel.
3.5 Connect the Ethernet Cable (Optional)
If you would like to use domain authentication for managing user accounts, import data directly from the instrument
using the NPX Signature software. You can optionally enable remote technical support, connecting the instrument to your
network by using an ethernet cable.
For more information on how to securely connect the Signature Q100 to a network, refer to Olink® Signature Q100 User
Manual (1172) and Olink® NPX Signature User Manual (1173).
13