8.2.1 Operation with 3 people
The first person is responsible to operate the control unit of the GeoSeeker Mini. Furthermore this
person adjusts the inner Voltage Electrodes (black socket).
The other two persons are responsible for the adjustment of the Power Electrodes (red socket). So each
of that two persons has control over a Power Cable Drum. One to the left and the other one to the right.
Both persons rearrange the electrodes according to the instructions of the first person who operates the
control unit. It is very recommended to use 3 walkie-talkies to give instructions because the distance to
the operator can be up to 100 meters (depending on the depth settings).
Make sure each participant knows about the possible danger of high voltage.
8.2.2 Operation with 5 people
This situation is similar to the previous one but there are two additional persons responsible for the
Voltage Electrodes (black socket) which are connected to the control unit.
So finally there is one person per electrode and the operator of the control unit is only giving
instructions and takes care about the whole scanning process.
OKM GmbH
Figure 8.3: Operating the GeoSeeker Mini with 3 people
Figure 8.4: Operating the GeoSeeker Mini with 5 people
Summary of Contents for FS Future GeoSeeker Mini
Page 1: ...FS Future Series GeoSeeker Mini User s Manual ...
Page 6: ......
Page 7: ...1 Introduction CHAPTER 1 Introduction ...
Page 12: ......
Page 13: ...2 Technical specifications CHAPTER 2 Technical specifications ...
Page 15: ...3 Scope of delivery CHAPTER 3 Scope of delivery ...
Page 30: ......
Page 48: ......