8
40180036GB
4.4. Example of an Installation of Gas Supply Line
The gas supply line after the pressure regulator must be of the same size or one size larger than
the valve train size.
As standard the gas connection to the burner is from the right side.
Note!
A hand-operated shut-off valve must be fitted before the gas valve train.
CAUTION!
A separate filter must be fitted before the gas valve train.
CAUTION!
The gas valve must be mounted tension free.
Gas pipe venting
A pipe or hose is connected, leading into the open from the measuring connection of inlet
pressure in the gas valve, to discharge the air. For venting open
slowly
the ball valve in the
supply line and fill the piping with gas. After this close measuring connection.
A - A delivery limit
Summary of Contents for GP-6.10 P
Page 2: ......