Assembly instructions
Obeya assembly instructions
1. Once all posts and extrusions are installed for the structure and leveled and electrical
is installed full wall panels where applicable can be installed.
2. With 2 people, lift panel into position against the top rail and cross rails with the top
of the wall panel being approx 1" above the top of the rail.
3. Applying pressure to the face of the wall panel at the top center & bottom of the
panel allow the panel to slide downward into place ensuring all panel clips have
engaged with the top rail and cross rail hanging ledges before releasing the panel.
Note:
Lifting the wall panel too high will cause the panel clip to catch on the top of
the extrusion causing a false sense of engagement. Top of wall panel should be flush
with top of top rail when seated correctly.
4. Secure wall panel using a tie down clip approx 6" from each end.
5. Aligning the rectangle nuts with the t-slots in the top rail place tie down clips in the
top of the top rail.
6. Secure by tightening the (2) #8-32 screws in each clip
Note
: one tie down clip will secure panels on both sides of the extrusion.
Hanging ledge
Tie down clip
Wall panel
Panel clip
Top rail
Hanging ledge
Panel clip
Panel clip
Cross rail
Full wall panel installation
Note:
Install wall panel
accessories before
hanging wall panels.
Note:
When doing a multi-panel wall, panels should
be shifted so panels are tight against each other and
approximately an 1/8" vein line between panel and post
at each end.