4.
Installation
4 Installation
4.1 Choice of the location
4.1.1
Positioning of the appliance
For the assembly and because of their design, PK 550 boilers require
no special base. Their closed furnace system means that the floor
need not have refractory properties. All you have to ensure is that the
floor can support the weight of the boiler when it is fitted for operation.
If the boiler location is not determined precisely, leave enough space
around the boiler to facilitate monitoring and maintenance
operations.
Boiler body *
Straight connection (not supplied) *
* 1) In order to facilitate subsequent work on the boiler(replacing the
water distributing tube etc.) use a flanged connection from the boiler
to the system, making sure you comply with minimum clearance
dimension
D
.
Angled connection (not supplied)
Air inlet
Air outlet
If
A = 1.2
m
(door opening side),
A’ = 0.5 m
If
A = 0.5 m,
A’ = 1.2 m
(door opening side): adapt the dimensions
on the basis of the dimensions of the burner when the door is open.
B = 1.5 m
: adapt the dimensions on the basis of the dimensions of
the burner.
D000923
Boiler
PK
550-9
PK
550-10
PK
550-11
PK
550-12
PK
550-13
PK
550-14
PK
550-15
PK
550-16
PK
550-17
PK
550-18
PK
550-19
PK
550-20
PK
550-21
PK
550-22
PK
550-23
PK
550-24
PK
550-25
L
1555
1645
1755
1845
1955
2105
2245
2355
2445
2555
2645
2845
2955
3045
3155
3245
3355
M
319
243
297
221
275
259
324
269
321
265
299
269
324
269
324
249
303
C min.
300
300
300
300
300
300
436
436
656
656
656
936
936
936
1266
1266
1266
D min.
-
-
-
-
-
-
136
136
356
356
356
636
636
636
966
966
966