![Oerlikon Leybold Vacuum 960 862 Operating Instructions Manual Download Page 29](http://html.mh-extra.com/html/oerlikon-leybold-vacuum/960-862/960-862_operating-instructions-manual_724989029.webp)
4
Operation
4.1 Operation
To avoid overloading the motor, do not start the pump more than 6 times
within one hour.
If more than 6 starts per hour are necessary keep the pump running and
mount a valve which opens and closes into the intake line.
Take note of warning labels on the pump.
Pumping of non-condensable gases
If the pump system contains mainly non condensable gases, the SV630 B
should be operated without gas ballast.
If the composition of the gases to be pumped is not known and if
condensation in the pump cannot be ruled out, run the pump with gas ballast
valve open in accordance with section below.
Pumping of condensable gases and vapors
With the gas ballast valve open and at operating temperature, the
SOGEVAC
®
SV630.B can pump pure water vapor up to the values indicated
in the Technical Data.
The gas ballast valve is opened by a screwdriver. The running noise of the
pump is slightly louder if the gas ballast valve is open. Before pumping
vapors ensure that the SV630 B has warmed up for approx. 30 min. with
closed intake line and with open gas ballast valve.
Don’t open the pump to condensable vapors until it has warmed to operating
temperature ; pumping process gas with a cold pump results in vapors
condensing in the oil.
For processes with a high proportion of condensable vapors, the intake line
should be opened only slowly after reaching the operating temperature.
One sign of condensation of vapors in the pump is a rise of the oil level
during operation of the pump.
When vapors are pumped, the pump must not be switched off immediately
after completion of the process because the condensate dissolved in the
pump oil may cause changes or corrosion. To prevent this, the pump must
continue to operate with open gas ballast valve and closed intake port until
the oil is free of condensate. We recommend operating the pump in this
mode for at least 30 min. after completion of the process.
In cycle operation, the pump should not be switched off between the cycles
but should continue to run with gas ballast valve open and intake port closed
(if possible via a valve). Power consumption is minimal when the pump is
operating at ultimate pressure.
Once all vapors have been pumped off from a process (e. g. during drying),
the gas ballast valve can be closed in order to improve the ultimate pressure.
Operation
Warning
Caution
Caution
Note
Note
29
GA02319_002_02 - 01/2007 - © Oerlikon Leybold Vacuum
Summary of Contents for 960 862
Page 17: ...17 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Description fig 4 ...
Page 43: ...43 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Spare parts DIRECTION OF ROTATION fig 10 ...
Page 44: ...44 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Spare parts DIRECTION OF ROTATION fig 11 ...
Page 45: ...45 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Spare parts fig 12 ...
Page 46: ...46 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Spare parts fig 13 ...
Page 47: ...47 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Spare parts fig 14 ...
Page 52: ...52 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum ...
Page 54: ...54 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Notes ...
Page 55: ...55 GA02319_002_03 07 2007 Oerlikon Leybold Vacuum Notes ...