![Ochsner OTE 3 Operating Instructions Manual Download Page 40](http://html1.mh-extra.com/html/ochsner/ote-3/ote-3_operating-instructions-manual_723515040.webp)
BA_OTE 3+4_Endkunde_EN_V03_20170726.docx
Page 40 of 52
15.4
Start the programme
Settings procedure:
1.
Press
the adjustment knob in the main
display > the main menu appears
2.
Select the Service Report by
turning
the
adjustment knob and confirm by
pressing
the knob.
3.
By
turning
the adjustment knob, select
Settings
in the Service Report menu and
confirm this by
pressing
the knob.
4.
By
turning
the adjustment knob,
select
Configuration
and confirm this by
pressing
the knob.
5.
By
turning
the adjustment knob, select
Drying program mode
and confirm this by
pressing
the knob.
6.
Select each heating circuit by
turning
the
settings knob and store by
pressing
, > re-
peated
pressing
of the ESC knob returns to
main display.
During the heating up phase, the following operational status will be displayed:
16: Heat up phase drying program
17: Equilibrium phase drying program
18: Cooling off phase drying program
19: Drying program terminated
1: Start heating circuit 1
ESC
ENTER
04-060
SERVICE REPORT
Drying program mode
04-076
Application type
0
04-045
Special command 0
04-060
Drying program
0
SERVICE REPORT
ESC
ENTER
04-000
Memorise sensor 0
SERVICE REPORT
Date
Time program
Setpoint and actual values
Configuration
ESC
ENTER
SERVICE REPORT
Master data
Error data
Passwort input
Settings
ESC
ENTER
Main menu
HEAT GENERATOR 2
HEAT MANAGER
CASCADE MANAGER
SERVICE REPORT
ESC
ENTER
Heating m ode
OCHSNER OTE
MENU
Sa 05.08.2017
08:10
3
5
1
2
4
6
Only ONE heating circuit can be started
at any time in drying mode.