![OBO Bettermann isCon 750 LGR System Instructions Download Page 55](http://html1.mh-extra.com/html/obo-bettermann/iscon-750-lgr/iscon-750-lgr_system-instructions_722015055.webp)
System instructions OBO isCon
®
EN | 55
Installing the isCon system
5 7 5
Creating additional equipotential bonding in potentially explosive
areas
The following information explains the creation of the equipotential bond-
ing of installations in potentially explosive areas. See also „4.4 Installation
in potentially explosive areas“ on page 24.
In Ex zones 1 and 21, connect the isCon cable to the equipotential bond-
ing at regular intervals (≤ 0.5 metres). To do this, bring the black cable
jacket into contact with metallic cable brackets, e.g. isCon H VA or PAE.
Routing on earthed, metallic building structures
For routing along an earthed, metallic building structure (e.g. electrically-
conductive connected metal facades, steel structures or mesh structures):
• Use the metallic isCon H VA cable bracket to fasten the cable to the
building structure.
• Connect the metallic building structure with the equipotential bonding
or with the earthing system.
≤ 500 mm
isCon H VA
Figure 62:
Equipotential bonding of the isCon cable on a metallic surface in a
potentially explosive area
Summary of Contents for isCon 750 LGR
Page 1: ...03 2014 EN isCon System instructions...
Page 65: ...System instructions OBO isCon EN 65 Own notes...
Page 66: ...OBO BETTERMANN 66 EN...
Page 67: ......