![OBO Bettermann isCon 750 LGR System Instructions Download Page 45](http://html1.mh-extra.com/html/obo-bettermann/iscon-750-lgr/iscon-750-lgr_system-instructions_722015045.webp)
System instructions OBO isCon
®
EN | 45
Installing the isCon system
• Position the interception rod stand on the concrete plinths.
Figure 48:
Positioning the interception rod stand
• Determine the inclination of the interception rod stand (depending on
the slope of the roof) using a spirit level.
• Compensate for the inclination of the interception rod stand using the
hexagonal height compensation nuts (max. 5 degrees).
• Tighten the lock nuts.
max. 5°
Figure 49:
Compensating the roof slope
Summary of Contents for isCon 750 LGR
Page 1: ...03 2014 EN isCon System instructions...
Page 65: ...System instructions OBO isCon EN 65 Own notes...
Page 66: ...OBO BETTERMANN 66 EN...
Page 67: ......