![OBO Bettermann isCon 750 LGR System Instructions Download Page 38](http://html1.mh-extra.com/html/obo-bettermann/iscon-750-lgr/iscon-750-lgr_system-instructions_722015038.webp)
OBO BETTERMANN
38 | EN
Installing the isCon system
• Push the retaining rod as far as it will go into the central rod. In so
doing, the opening for the left copper screw (see Figure 39) may not
point to the gap between the half shells of the potential connection,
but centrally to one of the half shells. If necessary, turn the half shells
accordingly.
Figure 38:
Pushing the retaining rod into the central rod
• Tighten the screws (20 Nm).
20 Nm
Figure 39:
Connecting the insulated interception rod and the retaining rod
Next steps:
– „5.4 Fastening the interception rod in the interception rod stand“ on
page 43 or „5.5 Fastening the interception rod to pipes, a wall or T
support“ on page 48
– „5.6 Routing the isCon cable“ on page 49
– „5.7 Attaching the potential connection“ on page 50
Summary of Contents for isCon 750 LGR
Page 1: ...03 2014 EN isCon System instructions...
Page 65: ...System instructions OBO isCon EN 65 Own notes...
Page 66: ...OBO BETTERMANN 66 EN...
Page 67: ......