![OBO Bettermann isCon 750 LGR System Instructions Download Page 32](http://html1.mh-extra.com/html/obo-bettermann/iscon-750-lgr/iscon-750-lgr_system-instructions_722015032.webp)
OBO BETTERMANN
32 | EN
Installing the isCon system
• Using a fork wrench (WAF 27 mm), screw the connection element
onto the isCon cable, until the copper core can be seen completely in
the two screw holes.
27 mm
isCon
Figure 24:
Screwing on the connection element
• Apply the screw lock varnish to the screw holes and tighten the two pin
screws with approx. 5 Nm.
5 Nm
Figure 25:
Applying screw lock varnish and tightening the pin screws
• Pull the heat-shrinkable sleeve on in such a way that the connection
element and cable transition are enclosed completely. Using a gas
torch or hot air at approx. 120°C, shrink the heat-shrinkable sleeve
and let it cool.
110-130 °C
1.
2.
Figure 26:
Shrinking the heat-shrinkable sleeve
Summary of Contents for isCon 750 LGR
Page 1: ...03 2014 EN isCon System instructions...
Page 65: ...System instructions OBO isCon EN 65 Own notes...
Page 66: ...OBO BETTERMANN 66 EN...
Page 67: ......