Oasis FreshStart FSTB-A60 Installation & Operation Manual Download Page 6

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

D.   SERVICING THE MECHANICAL FLOATS 

Resetting the Safety Float 

1.  Remove cover from cabinet. 
2.  Press down on the safety float 

re-set button (see figure 8). 

 
Float arm inspection 

1.  Remove float cap from top 

reservoir. 

2.  Float arms should move up and 

down freely and should not bind 
or catch (see figure 9). 

E.  INSPECT AND REPLACE CIRCUIT BOARD FUSE 

1.  Disconnect power cord from electrical outlet. 
2.  Remove cover from cabinet. 
3.  Locate fuse at the lower right side of the circuit board (see 

figure 8) and inspect the fuse filament for breakage. 

4.  If fuse appears to have blown, carefully remove it from the 

circuit board and check it for continuity. 

5.  If fuse is blown, replace it with a 25 volt, 5 AMP, slow blow 

fuse. 

F.  INSPECT AND REPLACE DUMP SOLENOID VALVE 

1.  Disconnect power cord from electrical outlet. 
2.  Remove cover from cabinet. 
3.  Locate dump solenoid (see figure 8) and visually inspect clear 

solenoid valve body for mineral build up or debris. 

4.  If build up or obstruction has occurred, remove the hot tank assembly 

from the outer cabinet (see section C). 

5.  Remove both sets of wires from the solenoid valve. 
6.  Remove from the solenoid valve both the silicone tube from the hot 

tank and the angled silicone tube going to the spray head. 

7.  Remove the dump solenoid by loosening the two screws that hold it to 

the bracket assembly.  Once the screws have been loosened, the 
solenoid valve can be removed from the bracket slots (see figure 10). 

8.  If replacement is required, assemble a new or refurbished dump 

solenoid valve in the reverse order. 

 

G. THERMOSTAT 

REPLACEMENT 

Primary Thermostat

 (see figure11) 

1.  Disconnect the power cord from both the electrical outlet 

and the IEC plug located at the rear of the brewer (see 
figure 5). 

2.  Remove the hot tank assembly from the outer cabinet (see 

section C). 

3.  Remove both wires from the anti boil thermostat. 
4.  Loosen tie wire and remove the rear half of the insulation 

from the hot tank. 

5. Using 

an 

11/32

 

inch nut driver, remove nut from thermostat 

threaded weld stud.  Nut secures thermostat and cover. 

6.  Remove thermostat cover. 
7.  Remove thermostat from threaded weld stud. 
8.  Remove both wires from thermostat. 
9.  Replace using the reverse order as above. 

NOTE:  When threading the nut back to the weld stud (the 
reverse of step 5) a torque value of 18 inch pounds must be 
applied for proper assembly. 
 

Anti-Boil Thermostat

 (see figure 11) 

1.  Follow steps (1-4) from Primary Thermostat. 
2.  Using a ¼ inch nut driver remove both screws from bracket.
3.  Replace using the reverse order. 

 

Figure 9

Mechanical Float Cap Assembly

Figure 10 

Dump Solenoid Valve

Loosen Solenoid 

Screws (2)

Limiter

Control

Primary 

Thermostat

Primary Thermostat 

Cover

Anti-Boil 
Thermostat

Figure 11 

Thermostat Locations 

Figure 8

Open Cover 

Safety float 

re-set button

Air filter

Circuit Board

Solenoid 
Valve 

Spray Head 
Tube 

Summary of Contents for FreshStart FSTB-A60

Page 1: ...Box 3150 Columbus OH 43213 0150 1 800 64 OASIS 1 800 646 2747 www OasisWaterCoolers com FSTB A60 FSTB A60C Length 20 1 2 Height 16 7 8 Width 9 7 8 1430 Watts 12 Amps 120 Volts Model includes carafe FSTB A80 Length 20 1 2 Height 21 1 2 Width 10 1 4 1430 Watts 12 Amps 120 Volts Manual PN 30099 256 ...

Page 2: ...beyond 90PSI a pressure regulator should be installed Flush water line prior to installing brewer Brewer should be connected to a COLD WATER LINE 1 Place brewer on a level surface 2 Insert water supply tube into external fitting see figure 1 Brewer is equipped with an external fitting located at rear capable of accepting a 3 8 tube NOTE Brewers are shipped with a plug in the external fitting Plug ...

Page 3: ...er is shut off to the brewer by pushing the ON OFF MAIN POWER switch to the OFF position 2 Press and hold down the BREW FULL POT button on the front control panel 3 While holding down the BREW FULL POT button push the ON OFF MAIN POWER switch at the rear of the unit to the ON position 4 Once the ON OFF MAIN POWER switch has been pushed to the ON position the BREW FULL POT button can be released Th...

Page 4: ...will stop flowing A BREWING COFFEE 1 Remove brew basket from brewer 2 Place one 1 standard commercial filter 9 5 inch diameter into brew basket 3 Put required amount of coffee grounds into filter and shake brew basket to level off coffee grounds 4 Return brew basket to brewer NOTE Brew basket is designed to click into place when properly installed This action secures the brew basket to the cabinet...

Page 5: ...n ENERGIZE BREWER HOT TANK HEAT UP Thermostat Adjustment Knob Rear Panel On Off main power switch IEC Cord Receptacle 3 8 Quick Tube Connect Rear Switch Plate Screws 2 C REMOVING HOT TANK ASSEMBLY FROM CABINET ASSEMBLY 1 Turn the main water supply to brewer OFF 2 Disconnect the power cord from both the electrical outlet and the IEC plug located at the rear of the brewer see figure 5 3 Disconnect 3...

Page 6: ...the bracket assembly Once the screws have been loosened the solenoid valve can be removed from the bracket slots see figure 10 8 If replacement is required assemble a new or refurbished dump solenoid valve in the reverse order G THERMOSTAT REPLACEMENT Primary Thermostat see figure11 1 Disconnect the power cord from both the electrical outlet and the IEC plug located at the rear of the brewer see f...

Page 7: ...1 Drain hot tank see Section C steps 1 8 2 Remove silicone tube from hot faucet 3 Remove 4 front panel assembly screws from inside cabinet 4 Remove 2 faucet bracket screws from front panel assembly 5 Loosen hot faucet nut and remove faucet from bracket 6 Replace hot faucet using the reverse order NOTE If dripping from hot faucet occurs the bonnet see Figure13 may be too loose To tighten turn bonne...

Page 8: ...ervice Instructions Section G Replace heating element Carafe Overflows Verify carafe is empty before brewing fresh pot Verify supply line pressure if needed add a pressure regulator Check that float arms are moving up and down freely and are not binding see Service Instructions Section D Check for mineral buildup clogs or kinks to water lines and fittings Remove and dry air filter see Service Inst...

Reviews: