Oasis FreshStart FSTB-A60 Installation & Operation Manual Download Page 2

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CAUTION: 

READ INSTALLATION / OPERATION INSTRUCTIONS PRIOR TO 
INSTALLING AND OPERATING THE FRESHSTART BREWER 

A. INSPECTION 

Brewer comes complete with brew basket, detachable power cord and installation/operation manual (carafe may be 
included, but is sold separately). 
1.  Inspect the carton and brewer for evidence of rough handling and concealed damage.  Damage claims should be 

filed with the carrier. 

2.  Remove top cover. 
3.  Remove float cap assembly from the feed reservoir.  Inspect float arms to ensure they are moving freely (shipping 

may cause floats to catch against the side of the float cap).  If float arm is caught, pull arm down and ensure it is 
moving freely. 

4.  Replace float cap assembly to the feed reservoir. 
5.  Check that the spray head tube from the solenoid valve to the spray head is securely connected (see Figure 8). 
6.  Replace top cover.

 

INSTALLATION INSTRUCTIONS 

C. ELECTRICAL 

CONNECTION 

1.  When tank has completed the water fill cycle, insert the IEC side of the electrical cord into the receptacle at the 

rear of the brewer. 

2.

 

Plug the three prong electrical cord in 120 Volts outlet capable of carrying 15 AMPS – 1600 Watts.

 

B.  CONNECTING WATER SUPPLY TO BREWER

 

IMPORTANT:

 

Unit must be installed on a water line with water pressure between 20 PSI and 90  

 

 

 

PSI.  If water pressure exceeds 90 PSI or has the ability to spike beyond 90PSI a  

 

 

 

pressure regulator should be installed. 

 

Flush water line prior to installing brewer.  Brewer should be connected to a COLD 

 WATER 

LINE. 

 

1.  Place brewer on a level surface. 
2.  Insert water supply tube into external fitting (see figure 1).  Brewer is equipped with an external fitting (located at 

rear) capable of accepting a 3/8” tube. 

 

NOTE: 

Brewers are shipped with a plug in the external fitting.  Plug must be removed before installing the water 

 supply 

tube. 

 

PLASTIC TUBING 

 

Cut tube ends square and straight.  Do not deform the tube (i.e., cause tube to compress its diameter so it is 
no longer round).

 

 

Make sure the outer surface of the tube is clear of marks or scratches for a length equal to twice the tube 
diameter.  This allows the “O” ring to seat properly against the tube (See Figure 1).

 

 

Avoid sharp changes in direction when routing the tubing.  Sharp turns cause the tubing to flex and deform 
which reduces its flow capacity.

 

 

QUICK-CONNECT FITTINGS 

 

Fittings consist of two parts:  a body and a collet (See Figure 1). 

 

To install a tube, push it through the collet until it seats firmly at the bottom of the fitting. 

 

To remove a tube, push and hold the collet against the body while pulling the tube out.

 

 
 
 
 
 
 
 
 
 

3.  Open water supply.  The tank will immediately begin to fill.  Tank fill time is approximately 3-5 minutes and is 

complete when the sound of flowing water has stopped. 

 
  

Figure1

 

How to Use Quick-

Connect Fittings

 

Push tube through Collet into Body 

Push Collet against Body to 

release tube 

Tube must seat firmly at bottom of fitting

Summary of Contents for FreshStart FSTB-A60

Page 1: ...Box 3150 Columbus OH 43213 0150 1 800 64 OASIS 1 800 646 2747 www OasisWaterCoolers com FSTB A60 FSTB A60C Length 20 1 2 Height 16 7 8 Width 9 7 8 1430 Watts 12 Amps 120 Volts Model includes carafe FSTB A80 Length 20 1 2 Height 21 1 2 Width 10 1 4 1430 Watts 12 Amps 120 Volts Manual PN 30099 256 ...

Page 2: ...beyond 90PSI a pressure regulator should be installed Flush water line prior to installing brewer Brewer should be connected to a COLD WATER LINE 1 Place brewer on a level surface 2 Insert water supply tube into external fitting see figure 1 Brewer is equipped with an external fitting located at rear capable of accepting a 3 8 tube NOTE Brewers are shipped with a plug in the external fitting Plug ...

Page 3: ...er is shut off to the brewer by pushing the ON OFF MAIN POWER switch to the OFF position 2 Press and hold down the BREW FULL POT button on the front control panel 3 While holding down the BREW FULL POT button push the ON OFF MAIN POWER switch at the rear of the unit to the ON position 4 Once the ON OFF MAIN POWER switch has been pushed to the ON position the BREW FULL POT button can be released Th...

Page 4: ...will stop flowing A BREWING COFFEE 1 Remove brew basket from brewer 2 Place one 1 standard commercial filter 9 5 inch diameter into brew basket 3 Put required amount of coffee grounds into filter and shake brew basket to level off coffee grounds 4 Return brew basket to brewer NOTE Brew basket is designed to click into place when properly installed This action secures the brew basket to the cabinet...

Page 5: ...n ENERGIZE BREWER HOT TANK HEAT UP Thermostat Adjustment Knob Rear Panel On Off main power switch IEC Cord Receptacle 3 8 Quick Tube Connect Rear Switch Plate Screws 2 C REMOVING HOT TANK ASSEMBLY FROM CABINET ASSEMBLY 1 Turn the main water supply to brewer OFF 2 Disconnect the power cord from both the electrical outlet and the IEC plug located at the rear of the brewer see figure 5 3 Disconnect 3...

Page 6: ...the bracket assembly Once the screws have been loosened the solenoid valve can be removed from the bracket slots see figure 10 8 If replacement is required assemble a new or refurbished dump solenoid valve in the reverse order G THERMOSTAT REPLACEMENT Primary Thermostat see figure11 1 Disconnect the power cord from both the electrical outlet and the IEC plug located at the rear of the brewer see f...

Page 7: ...1 Drain hot tank see Section C steps 1 8 2 Remove silicone tube from hot faucet 3 Remove 4 front panel assembly screws from inside cabinet 4 Remove 2 faucet bracket screws from front panel assembly 5 Loosen hot faucet nut and remove faucet from bracket 6 Replace hot faucet using the reverse order NOTE If dripping from hot faucet occurs the bonnet see Figure13 may be too loose To tighten turn bonne...

Page 8: ...ervice Instructions Section G Replace heating element Carafe Overflows Verify carafe is empty before brewing fresh pot Verify supply line pressure if needed add a pressure regulator Check that float arms are moving up and down freely and are not binding see Service Instructions Section D Check for mineral buildup clogs or kinks to water lines and fittings Remove and dry air filter see Service Inst...

Reviews: