Oasis SmartChem - INSTALLATION AND OPERATION MANUAL
Page
7
of
22
•
The injection hose has been installed between the peristaltic pump and the bottle/tub of Pool Acid,
with the Check Valve installed between the peristaltic pump and the lid of the Acid bottle/tub lid.
•
Install some leftover injection hose to the breather port on the bottle/tub lid.
IMPORTANT:
If the bottle/tub of
Pool Acid is stored inside a shelter
or shed, run some of the injection
piping from the breather port on
the lid, to outside of the shed or
shelter.
A through shed connection is
supplied to prevent a build-up of
fumes inside the shed/shelter.
ENSURE THAT THE OASIS SMART CONTROLLER IS RUNNING THE LATEST VERSION OF
SOFTWARE.
If not, complete any available Firmware Updates (see pg 9 of the Oasis Smart Quick Start Guide for
instructions on how to complete).
•
Lastly, connect the power cable from a valve actuator port (at the base of the Oasis Smart Master
Controller) to the
Oasis SmartChem
(see Base Plate Diagram on page 5). As power is only been
taken from the Valve Actuator output, the valve
INCORRECT
CORRECT
1.8M between
✓