Operating Instruction and Documentation
Sprinter Mobil 3000
- 27 -
- Do not use aggressive means for cleaning the workshop floor and the automotive lift.
- A permanent contact with any kind of liquid is not allowed. Do not use high
pressure devices
for cleaning the lift.
8. Security check
The security check is necessary to guarantee the safety of the lifting during use. It has to be
performed in the following cases:
1. Before the initial operation, after the first installation
Use the form “First security check before initiation”
2. In regular intervals after the initial operation, at least annually.
Use the form “Regular security check at least annually”
3. Every time the construction of that particular lift has been changed.
Use the form “Extraordinary security check”
The first and the regular security check must be performed by a competent person. It
is recommended to service the lift at this occasion.
After the construction of the lift has been changed (changing the lifting height or
capacity for example) and after serious maintenance works (welding on carrying
parts) an extraordinary security check must be performed by an expert.
This manual contains form with a schedule for the security checks. Please us the adequate form
for the security checks. The form should remain in this manual after they have been filled out. In
the following there is a short description about special safety devices.
9.Installation
9.1 Regulations
• It is possible to fasten the Lift on a even floor with dowels. (See the dowel pages)
• The installation of the lift is performed by trained technicians of the manufacturer or one of its
distribution partners. If the operator can provide trained mechanics, he or she can install the
lift by him or herself. The installation has to be done according to this regulation.
• Bore holes in the foundations so that base plates and be bolted down. Clean the holes with
compressed air. Put masonry bolts in and secure. The lift-manufacturer recommended
Liebig, Fischer or Hilti safety masonry bolts or equally good bolts from another manufacturer
(with licence). Be sure to observe their regulations (bore hole, torque...). Before bolting,
check that the concrete- floor is of quality min.C20/25, thickness min.160mm normal
armouring. If the entire floor is concrete (there is no surface covering), bolts must be
Summary of Contents for Sprinter Mobil 3000
Page 9: ...Operating Instruction and Documentation Sprinter Mobil 3000 9 2 5 Declaration of conformity...
Page 14: ...Operating Instruction and Documentation Sprinter Mobil 3000 14 3 2 Data sheet...
Page 17: ...Operating Instruction and Documentation Sprinter Mobil 3000 17...
Page 18: ...Operating Instruction and Documentation Sprinter Mobil 3000 18...
Page 19: ...Operating Instruction and Documentation Sprinter Mobil 3000 19...
Page 20: ...Operating Instruction and Documentation Sprinter Mobil 3000 20...