9 . Installation and Initiation
Installation of the lift
Regulations for the installation
• The installation of the lift is performed by trained technicians of the manufacturer
or its distribution partner. If the operator can provide trained mechanics, he can
install the lift by himself. The installation has to be done according to this
regulation.
• The standard lift must not be installed in hazardous locations or washing areas.
• Installing the lift you need at least a reinforcement of 3,5 cm
2
/m Fe, quality B 25
(DIN 1045) in both directions at the upper and lower side of the plate. The thickness
of the carrying concrete should be at least 200 mm. In case of other foundation or
ground conditions a foundation according to foundation plan (refer to foundation
plan) has to be provided: An even installation place has to be provided. The
foundations must be based in a frost resistance depth, both outside and indoors,
where you must reckon with frost
• An electric supply (observe the power supply of your state) has to be provided. The
supply must be protected by customers (fuses). The electrical connection is located
in command unit.
• All cable ducts have to be equipped with protective coverings to prevent accidents.
Erection and doweling of the lift
• Install the lift according to the data sheet and the foundation plan and line it up.
• Put both synchronizing ropes over the rolls at the top and insert them from the upper
side in column. The ropes must not be crossed!
• Connect hydraulic hose between the two columns. Don’t fix connection at opposite
side too tight and don’t fasten the connection. Be sure that hydraulic hose doesn’t
hinder the course of the synchronizing ropes.
• Put traverse topside on columns and fix it with enclosed cylinder screws and
washers
• Connect oil-return line (synthetic material) at both columns (see pic. 4)
• Check position of the lift
• Bore holes to fix the dowels through the borings of the base plates. Clean holes with
pressure air. Put in safety dowels with washers in borings. The manufacturer
demands LIEBIG safety dowels type B 20 or equal dowels of another manufacturer.
Before doweling check concrete floor with quality B 25 if the concrete floor goes to
the top edge of the floor. In this case the dowels have to be chosen according to
picture 2. If the ground is covered with floor tiles, the dowels have to be chosen
2 3
Instruction and Documentation
SPL 3200
Summary of Contents for SPL 3200
Page 7: ...7 Instruction and Documentation SPL 3200...
Page 9: ...Data sheet 9 Instruction and Documentation SPL 3200 command unit...
Page 10: ...Foundation plan 10 Instruction and Documentation SPL 3200 Quality of the concrete B25...
Page 12: ...12 Instruction and Documentation SPL 3200 Clamped connection drawing...
Page 14: ...Electrical diagram drawing Canada version 3 Phase 14 Instruction and Documentation SPL 3200...
Page 30: ...30 Instruction and Documentation SPL 3200 pic 5 ratchet rope...
Page 38: ...Spare parts list drawing carriages standard carrying arms Spare parts list SPL 3200...
Page 40: ...Spare parts list drawing hydraulic aggregate Spare parts list SPL 3200...