background image

7

08. 04. 21. Document Number  671971

Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk

HTS / HTE

Installation Manual

NOTES

Summary of Contents for Haven HTS

Page 1: ... Keep these instructions in a location where they are accessible to all users at all times Always include the operating instructions when you pass the product on to third parties 1 3 Personal Protective Equipment The following minimum Personal Protective Equipment PPE is recommended when interacting with Nuaire product Protective Steel Toed Shoes when handling heavy objects Full Finger Gloves Mari...

Page 2: ... it is recommended that the system is first cleaned by a BESA registered contractor and the system capacity and functionality verified 3 1 1 Supply Terminals Single HTS1 See Section 3 2 Multiple HTS4 HTS9 HTS12 See Section 3 3 2 Typical Single Supply Diffuser Installation 3 Typical Multiple Supply Diffuser Installation 3 1 2 Extract Terminals HTE1 HTE2 HTE3 See Section X X 4 Typical Extract Termin...

Page 3: ... to obscure the cut edges of the ceiling hole Two M5 screw with caps are provided If required the facia plate may be carefully trimmed to shape with metal shears The directional louvre may be moved into the desired position at this stage if known to the installer 3 3 HTS 4 9 12 Multiple Supply Terminal Installation The terminal consists of a corrosion resistant steel housing with a quantity of adj...

Page 4: ...gnated location prepare a square opening in the ceiling surface 210 x 65 mm in the required orientation Drop a plumb line from a rear corner of the opening to establish the location of the floor plate Secure the floor plate to the floor With the terminal grille facing into the room fit the terminal housing to the floor plate using the screws and screw caps provided Fit the vertical ductwork to the...

Page 5: ...recorded and that the schedule is always adhered to in all cases the previous report should be referred to Note and ensure that the position of adjustable louvres is maintained during the maintenance operation 4 1 HTS1 HTE1 HTE2 HTE3 Maintenance The single supply terminal HTS1 and extract terminals HTE1 2 3 require cleaning only when necessary vacuum and wipe over with a clean damp cloth do not us...

Page 6: ...nd fully recycled EPP plastic ducting nylon corner pieces plastic heat exchangers packaging material and other plastic components can be segregated into mixed plastic and widely recycled Cardboard packaging wood used filters and other paper components can be largely recycled or fully processed in energy from waste centres Remaining Items can be further segregated and processed in accordance with t...

Page 7: ...7 08 04 21 Document Number 671971 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk HTS HTE Installation Manual NOTES ...

Page 8: ...8 08 04 21 Document Number 671971 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk HTS HTE Installation Manual NOTES ...

Reviews: