HTE(1/2/3) Extract Terminal Duct Connections

The transition piece should be secured to a suitably rigid structure in 
the ceiling void.

The gap between the vertical duct and ceiling cut-out should be fully 
sealed with a proprietary low modulus, neutral cure mastic.

The transition piece is supplied with blanking plates. To remove these, 
pull out and retain the wire fixing clip and remove plate from the port. 
Ensure that unused ports have blanking plates with sealing rings fitted 
and wire fixing clip in place.

The semi-rigid ducting is installed by first locating the sealing ring 
provided into the second complete groove in the duct outer surface.

Mark the semi-rigid duct at 35mm from the cut end, and push evenly 
into the port aperture. When secure, insert the port’s wire fixing clip 
to retain the duct. No further sealing of the connection is required or 
should be applied.

This duct type is largely self- supporting, and may be readily cut with 
a hacksaw and manually formed into swept bends with a minimum 
internal radius of approx. 150mm. Compact 90° bend components are 
also available from Nuaire with similar sealed port design 

(product 

code NRDD75-90).

For extended lengths of duct, supports with a maximum spacing of 1m 
must be provided.

The duct must not be used to support the weight of the transition 
housing or other components. If the duct becomes kinked or crushed, 
the affected section must be discarded and replaced.

Once the installation is complete, the facia plate may be attached to 
the lower surface of the housing to obscure the cut edges of the ceiling 
hole using screw caps provided and screws / plugs appropriate to the 
ceiling type.

If required, the facia plate may be carefully trimmed to shape with 
metal shears.

4.0 MAINTENANCE

It is important that maintenance checks are recorded and that the 
schedule is always adhered to, in all cases, the previous report should 
be referred to.

Note and ensure that the position of adjustable louvres is 
maintained during the maintenance operation.

4.1 HTS1, HTE1, HTE2 & HTE3 Maintenance 

The single supply terminal (HTS1) and extract terminals (HTE1/2/3) 
require cleaning only when necessary – vacuum and wipe over with a 
clean damp cloth – do not use cleaning agents on these products.

Check for damage and visible obstructions to louvre / grille and rectify / 
remove as necessary. 

4.2 HTS4, HTS9 & HTS12 Maintenance

As required, clean the visible surface of the terminal - vacuum and wipe 
over with a clean damp cloth – do not use cleaning agents on these 
products.

Check for damage and visible obstructions to louvres and rectify / 
remove as necessary. 

4.3 Filter Maintenance

Where a filter has been fitted to a Haven terminal, it will have been 
selected for its particular properties and must only be replaced 
with a new filter with the same properties.

Failure to observe this requirement will result in compromising the 
intended level of Indoor air quality in the occupied space, and may 
be detrimental to the health and well-being of occupants.

Filter changing should be carried out in accordance with the system 
design requirements, but an annual filter change is the minimum 
requirement. 

Failure to do so may impair the performance and 

energy efficiency of this unit.

The filter is accessed through the hinged lower panel of the terminal.

The panel is hinged at the side opposite to the retaining latches. 

Undoing the latches will free the panel and a weight of up to 4kg will be 
released. 

Whilst manually supporting the panel centrally between the latches, 
release them in turn by rotating through 90°.

Gently lower the hinged panel down to its greatest extent.

The filters are 525 x 460 x 80mm and weigh up to 4kg (ePM1 type) and 
5kg (E11 type).

Remove the old filter, place in a suitable bag and seal.

Remove the new filter from its packaging and refit in housing.

Lift the hinged panel to its original position and re-secure the latches 
(full 90 degree rotation).

 
 

16 

Filter Replacement 1

Summary of Contents for Haven HTS

Page 1: ... Keep these instructions in a location where they are accessible to all users at all times Always include the operating instructions when you pass the product on to third parties 1 3 Personal Protective Equipment The following minimum Personal Protective Equipment PPE is recommended when interacting with Nuaire product Protective Steel Toed Shoes when handling heavy objects Full Finger Gloves Mari...

Page 2: ... it is recommended that the system is first cleaned by a BESA registered contractor and the system capacity and functionality verified 3 1 1 Supply Terminals Single HTS1 See Section 3 2 Multiple HTS4 HTS9 HTS12 See Section 3 3 2 Typical Single Supply Diffuser Installation 3 Typical Multiple Supply Diffuser Installation 3 1 2 Extract Terminals HTE1 HTE2 HTE3 See Section X X 4 Typical Extract Termin...

Page 3: ... to obscure the cut edges of the ceiling hole Two M5 screw with caps are provided If required the facia plate may be carefully trimmed to shape with metal shears The directional louvre may be moved into the desired position at this stage if known to the installer 3 3 HTS 4 9 12 Multiple Supply Terminal Installation The terminal consists of a corrosion resistant steel housing with a quantity of adj...

Page 4: ...gnated location prepare a square opening in the ceiling surface 210 x 65 mm in the required orientation Drop a plumb line from a rear corner of the opening to establish the location of the floor plate Secure the floor plate to the floor With the terminal grille facing into the room fit the terminal housing to the floor plate using the screws and screw caps provided Fit the vertical ductwork to the...

Page 5: ...recorded and that the schedule is always adhered to in all cases the previous report should be referred to Note and ensure that the position of adjustable louvres is maintained during the maintenance operation 4 1 HTS1 HTE1 HTE2 HTE3 Maintenance The single supply terminal HTS1 and extract terminals HTE1 2 3 require cleaning only when necessary vacuum and wipe over with a clean damp cloth do not us...

Page 6: ...nd fully recycled EPP plastic ducting nylon corner pieces plastic heat exchangers packaging material and other plastic components can be segregated into mixed plastic and widely recycled Cardboard packaging wood used filters and other paper components can be largely recycled or fully processed in energy from waste centres Remaining Items can be further segregated and processed in accordance with t...

Page 7: ...7 08 04 21 Document Number 671971 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk HTS HTE Installation Manual NOTES ...

Page 8: ...8 08 04 21 Document Number 671971 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk HTS HTE Installation Manual NOTES ...

Reviews: