23
9. SETTING METHODS
9-1. Setting and Procedure Before the Operation
Explains usage procedures of ABSOCODER.
Converter mounting
Mounting the converter (VE-2CC/VM-2CC).
Connect with external device
Connect ABSOCODER sensor and dedicated cable for
CC-Link.
Switch setting
Set the station No. and communication speed setting switch.
Test run
Check the operation.
-Check the current position value can be read.
-Check the current position value can be set.
START
Operation
Execute operation.
END
Summary of Contents for VE-2CC
Page 2: ......
Page 11: ...6 4 DIMENSIONS 4 1 Converter VE 2CC VM 2CC Units mm...
Page 12: ...7 4 2 ABSOCODER Sensor 1 VRE P028 Units mm...
Page 13: ...8 2 VRE P062 Units mm...
Page 14: ...9 Units mm...
Page 15: ...10 3 MRE 32SP062 MRE G SP062 Units mm...
Page 16: ...11 Units mm...
Page 17: ...12 4 3 Extension Sensor Cable 3P S 0102 L 3P RBT 0102 L 4P S 0102 L 4P RBT 0102 L Units mm...