36
NRG_34m_TallTower_Installation_Manual_and_Specifications_Rev_1.05.docx
19 April 2011
Plumb and Straighten
Make final adjustments to the guys. Using a carp
enter‟s level on the base tube, adjust the lowest level guy wires as
needed so the base tube is vertical. Working upward, adjust all four guys at each level while sighting up the tower
from the base to straighten the tower (see picture below).
As you finalize the straightening of the tower, you will need to set the final tension on the guys.