28
NRG_34m_TallTower_Installation_Manual_and_Specifications_Rev_1.05.docx
19 April 2011
Attach the lifter wires
Attach each of the four lifter wires to the ginpole using the supplied quick links. Be sure to connect them in the
proper order and make sure they are not tangled with each other or side or back guy wires.
Lifter #
Lifter Color
Quick Link (number indicates
hole)
4
Yellow
2 (top - away from base of tower)
3
Black
2
2
White
1
1
Red
1 (bottom
– toward base of tower)
Table 4
Configure the helper ginpole
Put the helper ginpole standing vertically (pulleys pointing towards the sky) on the baseplate behind the main
ginpole. Line up the holes in the helper ginpole with the holes in the baseplate‟s vertical channels. Slide the ¾” x 8”
bolts through holes to secure in a vertical position. Secure the bolts with the provided nuts. The hardware kit
con
tains two 5” diameter pulleys and an axle bolt to be used on the top of helper ginpole. If you are only using a one
part line from the winch, the second pulley is not needed.