30
NRG_34m_TallTower_Installation_Manual_and_Specifications_Rev_1.05.docx
19 April 2011
Ginpole Tilt-Up
Confirm all lifters and shackles are secure
Carefully double check all connection points to make sure everything is secure before starting to lift the ginpole.
Lift the ginpole
Make sure the ginpole remains centered side to side and that the brown ropes are both snug. If the ginpole is off
center, carefully adjust the ropes to re-center. As the ginpole comes up, remove the helper ginpole when the winch
cable is no longer in contact with the pulleys on the end of the helper ginpole. Pay attention to the lifters to make
sure they are not caught on objects in the area (stumps, debris, rocks, equipment, etc.). Also check that they are not
crossed over each other or the other guy wires. As the lifter wires tighten,
stop
.
Do not lift the tower yet. Check that the shackles are not twisted at the guy rings.