______________________________________________________________________________
Page 28
Version 6.0
______________________________________________________________________________
NovaTec
Mobile Gateway S20
Picture 7:
Structure of line connections to the NovaTec
Mobile Gateway S20
In case of delivery in a cabinet by NovaTec, all trunk and terminal equipment interfaces
on the NovaTec
Mobile Gateway S20 are fed through a main distribution frame or a patch
panel. This includes all lines from the trunk or subscriber to the NovaTec
Mobile Gateway S20
and the lines from NovaTec
Mobile Gateway S20 to the switch.
4.9
Connecting the NovaTec
Mobile Gateway S20
All lines leaving the building must have a coarse protection to guard
against power surges due to lightning strike.
The following structural diagram illustrates the connection of these lines:
Main distribution frame
Trunk U (E-DSS1)
NTPM
E1
Important:
Before commencing installation please note
Chapter 5.2
Antenna
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT
RF
OUT