CONTROL BOX STATUS
INSIDE LIGHTS
RED LIGHT
FLASHING
TEST OPERATION
This test operation is specifically for the installation instructions to verify the Lock-Up
™
is working properly. If the Lock-Up
™
does not work properly, contact NOVA Technology.
1. Power-Up
a. Unlatch metal clips on the right side of control box holding the cover on.
b. Open the cover of the control box.
c.
Turn on the circuit breaker by flipping switch upward.
FIGURE I—CIRCUIT BREAKER
FIGURE J—STANDARD PLC SCREEN
d. Close the cover of the control box.
e. Re-latch the metal clips to secure the cover.
f. Remove protective film from PLC display.
g. Verify PLC screen shows “Lock-Up
™
” as shown
in figure J.
h. Verify the red light on the control box is flashing.
i. Verify the outside green light is flashing.
FIGURE K—STORE POSITION/NO VEHICLE PRESENT
INSTALLATION INSTRUCTIONS
(continued)