background image

19 

 
 

 
 
 

 
 

 
 
 

 
 
 

 
 

 
 
 

Summary of Contents for TT 200 EM

Page 1: ...TT 200 EM OPERATING INSTRUCTIONS...

Page 2: ...2...

Page 3: ...D clare que le mat riel neuf d sign ci apr s Scie de carrelage TT 200 Code 70184625701 est conforme aux dispositions des Directives MACHINES 2006 42 CE BASSE TENSION 73 23 CEE Compatibilit lectromagn...

Page 4: ...4...

Page 5: ...10 3 1 Tool assembly 10 3 2 Guide a cut assembly 10 3 3 Electrical connections 10 3 4 Starting the machine 10 3 5 Water cooling system 11 4 Transport and storing 12 4 1 Securing for transport 12 4 2...

Page 6: ...tion and servicing requirements shall also be considered as included under use in accordance with the regulations 1 1 Symbols Important warnings and pieces of advice are indicated on the machine using...

Page 7: ...drawn to the use of BS2092 safety goggles in conformity with specified Processes No 8 of the Protection of Eyes Regulation 1974 Regulation 2 2 Part 1 Electrical powered machine Always turn off the mac...

Page 8: ...ucts the operator will immediately appreciate the attention given to detail and quality of materials used in construction The machine and its component parts are assembled to high standards assuring l...

Page 9: ...desired cutting width It is locked using two screws A guide to make mitre cut is also supplied with the machine Blade guard 6 Blade guard with 200mm diameter blade capacity which offers maximum opera...

Page 10: ...it from the machine Clean the flanges and blade shaft and inspect for wear Mount the blade on the flange ensuring that the direction of rotation is correct check with the arrow on the blade guard Wro...

Page 11: ...ater tray Ensure that water is delivered adequately to both sides of the blade as insufficient water supply may result in premature failure of the diamond blade Always make sure that there is enough w...

Page 12: ...always remove the blade and empty the water pan 4 2 Long period of inactivity If the machine is not going to be used for a long period please take the following measures Completely clean the machine E...

Page 13: ...you must face it with the two hands on the tile to be cut pushing the tile against the blade Always keep your hands away from the moving blade To set the guide a cut at the desired cutting width rele...

Page 14: ...an Flange and blade fixing devices Clean Motor cooling fans Clean Water pan Clean Engine housing Clean Reachable nuts and screws Tighten up Maintenance of the machine Always perform the maintenance of...

Page 15: ...service When ordering spare parts please mention The serial number 7 digits The code of the part The exact denomination The number of parts required The delivery address Please indicate clearly the m...

Page 16: ...eda del Congost s n E 08160 MONTMEL Barcelona Tel 0034 935 68 6870 Fax 0034 935 68 6714 e mail Comercial sga apa saint gobain com Poland Saint Gobain Diamond Products Sp zO O AL Krakowska 110 114 PL 0...

Page 17: ...17...

Page 18: ...18...

Page 19: ...19...

Page 20: ...20 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 08 12 2008...

Reviews: