13
5 Operating the machine
5.1 Site of work
5.1.1 Siting the machine
•
Remove from the site anything, which might hinder the working procedure!
•
Make sure the site is sufficiently well lit!
•
Observe manufacturer's conditions for connecting to power supplies!
•
Place electric cables in such a way that damage by the device is excluded!
•
Make sure you have a continual adequate view of the working area so you can intervene in the
working process at any time!
•
Keep other staff out of the area, so you can work securely.
5.1.2 Space required for operation and maintenance
Leave 2 m around the machine for usage and maintenance of the TT200EM.
5.2 Cutting methods
To use the machine correctly, you must face it with the two hands on the tile to be cut, pushing the
tile against the blade. Always keep your hands away from the moving blade.
To set the guide-a-cut at the desired cutting width, release it, and use the two scales on the table to
align the guide. Then tighten it back.
5.3 General advice for the cutting
•
Only tiles with max. dimensions 400x400x6mm and max. weight 3kg can be cut with the
machine.
•
Before commencing work make sure tools are firmly seated!
•
Select the right tools as recommended by the manufacturer depending on the material to be
worked, the working procedure (dry or wet cut) to be carried out and the required efficiency.
•
Make sure the water tray contains enough water.
•
Set the guide-a-cut to the desired width of cut, using the two engraved measurements to align it
correctly.
•
Do not force on the motor. This machine is not designed for a continuous use.