Chapter Four: Installation and Operation
© 2018 Cutting Edge Optronics, Inc.
32
Patara I and II Laser User Manual
Figure 4-13. Signal Connection
4.
Connect the power cords for eDrive.
5.
Verify that everything is connected properly and locked. Check that all of the
interlocks (three BNC:
TRIGGER/GATE IN
,
QWS THERM INTLK
,
INTERLOCK
; one black
CHILLER
; and one white
INTERLOCK
shorting
connectors) are in place on the back of the eDrive (see
Figure 4-10
). The
black and white connectors are not in place during shipment and will need to
be connected by the user.
6.
Lay out all of the cables and water hoses. Mount the water filter securely.
PolyScience 6000 Power-Up Procedure
The following steps indicate how to turn on the PolyScience 6000 series for the
first time.
1.
Fill the reservoir. Remove the filler cap from the reservoir and, using a funnel,
add fill the reservoir with a mixture of 10% Optishield Plus and distilled water
until it reaches the MAX line on the reservoir’s fluid level gauge. When full,
remove the funnel, but do not replace the cap at this time.
WARNING.
Do not use untreated deionized water in the system as it is aggressive in
nature and can attack and corrode the metals in the laser head.
2.
Connect the electrical power. Plug the chiller’s power cord into an appropriate
electrical outlet. Place the
Circuit Breaker/Power Switch
on the rear of the
instrument enclosure to the
On
position. Three decimal points appear on the
temperature display; two decimal points appear on the pressure/flow rate
display.