![Northern Telecom Meridian SL-1 Installation And Testing Instructions Download Page 32](http://html1.mh-extra.com/html/northern-telecom/meridian-sl-1/meridian-sl-1_installation-and-testing-instructions_1708625032.webp)
I n s t a l l a t i o n 3 - 2 5
2-Mb/s Remote Peripheral Equipment Appendix 1 to 553-2741-200
16 If not previously connected, connect the other end of the power
cable as follows:
a) QCAD276 power cable.
• Connector P3 to J3 at the rear of the QUAA3 power unit.
• Black leads equipped with ring connections to the GRD2 lug
on the ground bus near the rear of the QUAA3 unit.
• White leads equipped with ring connections to the GRD1 lug
on the ground bus.
• The red lead designated 2 equipped with a spade connector
to TB5 terminal 2 at the rear of the QUX20 unit.
• The blue lead designated 3 equipped with spade connector
to TB5 terminal 3 at the rear of the QUX20 unit.
b) QCAD277 power cable
• Connector P4 to J4 at the rear of the QUAA3 power unit
• Black leads equipped with ring connections to the GRD2 lug
on the ground bus near the rear of the QUAA3 unit.
• White leads equipped with ring connections to the GRD1 lug
on the ground bus.
• The red lead designated 4 equipped with spade connector
to TB5 terminal 4 at the rear of the QUX20 unit.
• The blue lead designated 5 equipped with spade connector
to TB5 terminal 5 at the rear of the QUX20 unit.
17 Reinstall top panel and secure to top shelf with four hex screws
at each end.
18 Install the two shelf side panels by sliding them down the grooves
located in the uprights at each end of the new shelf.
Note:
The flange on the side panels should be positioned at the
top facing towards the inside of the new cabinet.