North CORFU Installation And Service Instructions Manual Download Page 6

2.1 INSTALLATION OF THE APPLIANCE.......................................................

After  making  sure  the  appliance  is  intact,  place  it  in  position  so  that  it  is  stable  and
there is adequate operating space around it.
Can be also place a same type electrical oven or heating chamber, or on a simple iron
base.

Attention  !

To  avoid  accidents,  keep  all  packing  materials  (cardboard,  plastic  bags,

metal items, etc) away from children.

Important  !

Install  the  oven  on  a  flat  non-flammable  surface,  away  from  flammable

walls.

2.2 ELECTRICAL CONNECTION......................................................................

For  models  (F80/F80T/F81T/F135/F135T/F136T/F65A/F70T/F80P)  remove  the  right
cover of the appliance. For models (F50/CORFU/RHODES/CRETE) remove the back
side cover of the appliance.

  Enter a suitable supply cord through the gland.

  Depending on the available power supply connect the cables.

. Single phase power supply

HO7RNF

3x2.5

3x4

3x6

Remove the provided bridges
and short circuit L1, L2.
Connect the phase to  L1 or L2,
the neutral to   1 or  2
and earth to earth terminal.

F50

CORFU

F80

F80T
F81T

RHODES

CRETA

F135

F135T
F136T

F80P

b. Two phases power supply

HO7RNF 4x2.5

HO7RNF 4x4

Connect the phases to L1, L2.
Connect the earth neutral to  1 or  2.
Connect the earth.

F80

F80T
F81T

RHODES

F65A

F135

F135T
F136T

CRETE

c. Three phases power supply

HO7RNF 5x4

HO7RNF 5x2.5

Connect the phases to L1, L2.
Connect the earth neutral to  1 or  2.
Connect the earth.

F70T
F80P

F135/F135T

F136T/CRETE

Connect P.A. terminal to water piping using a 10 mm² wire.

IT  IS  STRONGLY  RECOMMENDED  TO  USE  A  QUALIFIED  ELECTRICIAN

FOR ALL ELECTRICAL CONNECTIONS.

THE  MANUFACTURER  CANNOT  BE  HELD 

RESPONSIBLE 

FOR

ACCIDENTS  AND  DAMAGE  CAUSED  TO  PERSONS,  ANIMALS  OR  PROPERTY
DUE TO NONCOMPLIANCE WITH THESE INSTRUCTIONS.

Summary of Contents for CORFU

Page 1: ...ETA These appliances comply with requirements of E E C 73 23 CEE EN 60335 1 EN 60335 2 36 SOTIRIOS D PRODANAS PROFESSIONAL ELECTRIC GAS MACHINES FOR RESTAURANTS PATISSERIES SNACK BAR OFFICE FACTORY National road Kilkis Thessaloniki P C 611 00 TEL 30 23410 41819 FAX 30 23410 41539 P O BOX 400 70 P C 564 04 www north gr e mail info north gr ...

Page 2: ... 3 600 RHODES 760 780 645 4 800 CRETE 760 780 775 6 000 F80P 790 800 520 7 500 Chamber Dimensions MODEL LENGHT mm WIDTH mm HEIGHT mm F 80 F 80T 570 790 175 F 135 F 135T 1100 790 175 F 81T 600 810 195 F 136T 1100 810 195 F50 500 500 130X2 F65A 600 600 130 F70T 600 600 130X2 CORFU 480 620 130X2 RHODES 480 620 130X3 CRETE 480 620 130X4 F80P 550 610 130X2 Electrical Supply F 80 F 80T F65A F81T RHODES ...

Page 3: ...handles one for each door Hole for ventilation Ø30 mm for F 80 F 80T F 81T Ø50 mm regulated for F 135 F 135T F 136T Glass wool chamber insulation Electrical Components Wire heating elements F 80 F 80T 1 x 2 800 Watt bottom and 1 x 2 200 Watt above F 135 F 135T 2 x 3 600 Watt F 81T 1 x 2 800 Watt bottom and 1 x 2 200 Watt above F 136T 2 x 3 600 Watt F50 3x1 200 Watt F65A 1x2 000 Watt above bottom 1...

Page 4: ... incongruence or if in doubt do not connect the apparatus Ask for the equipment to be checked by specialized personnel NORTH ovens equipment are commercial grade appliances and should there for be used by personnel who are specially trained in their use All procedures concerning installation and connection of the appliance must be carried out exclusively by specialized technicians according to spe...

Page 5: ...BLY AND CONNECTION PROCEDURES TESTING AND REQUIRED REPAIRS MUST BE CARRIED OUT BY SPECIALIZED AND AUTHORIZED PERSONNEL ONLY NORTH ENTERPRISES CANNOT BE HELD RESPONSIBLE FOR ANY NEGATIVE CONSEQUENCES IN CASE OF INTERVENTIONS BY NON SPECIALIZED TECHNICAL PERSONNEL OR DUE TO NONCOMPLIANCE WITH FACTORY INSTRUCTIONS ...

Page 6: ...ailable power supply connect the cables Single phase power supply HO7RNF 3x2 5 3x4 3x6 Remove the provided bridges and short circuit L1 L2 Connect the phase to L1 or L2 the neutral to 1 or 2 and earth to earth terminal F50 CORFU F80 F80T F81T RHODES CRETA F135 F135T F136T F80P b Two phases power supply HO7RNF 4x2 5 HO7RNF 4x4 Connect the phases to L1 L2 Connect the earth neutral to 1 or 2 Connect ...

Page 7: ...move the right side cover of the appliance Release the wires and remove the heating element holding screws inside chamber For the lower heating element remove the grill plate The lighting lamp is replaced from the inside of the chamber after removing lamp s lid For the thermostats indicating lamps and lighting switches remove the right side cover of the appliance CUT OFF THE POWER SUPPLY BEFORE CO...

Page 8: ...MENT ALL ASSEMBLY AND CONNECTION PROCEDURES TESTING AND REQUIRED REPAIRS MUST BE CARRIED OUT BY SPECIALIZED AND AUTHORIZED PERSONNEL ONLY NORTH ENTERPRISES CANNOT BE HELD RESPONSIBLE FOR ANY NEGATIVE CONSEQUENCES IN CASE OF INTERVENTIONS BY NON SPECIALIZED TECHNICAL PERSONNEL OR DUE TO NONCOMPLIANCE WITH FACTORY INSTRUCTIONS ...

Page 9: ...elements will control the chamber s temperature picture 1 During operation indicating lamp is on For chamber s lighting set lighting switch to position 1 picture 2 For the ventilation of the chamber roll the operation knob at left side of the appliance picture 3 3 2 CLEANING AND MAINTENANCE Turn off the heating elements before any cleaning or maintenance procedures Let the appliance cool and make ...

Reviews: