![North Ridge Pumps seepex BN Series Operating And Maintenance Instructions Manual Download Page 23](http://html1.mh-extra.com/html/north-ridge-pumps/seepex-bn-series/seepex-bn-series_operating-and-maintenance-instructions-manual_1707791023.webp)
s
Operating Instructions
Progressive Cavity Pump
Pin Joint Assembly
S
Dokument
document
Blatt
sheet
Datum
date
OM.PJT.01e
2 (2)
A / 20.04.95
3.
Joint - Re-assembly
CAUTION
To guarantee the proper function of the joints, it is
advisable to renew the coupling rod pins (402), guide
bushes (403) all at the same time.
•
Joint top on rotor (600) and plug-in shaft (307)
- Press guide bushes (403) in using tool (W4/see
Point 9)
- Fill joint top with joint grease (098), see index for
special grease
•
Coupling rod (400)
•
Retaining sleeve (401)
•
Securing of retaining sleeve
Secure offset by 2x180° with tool/center punch
(WK)
•
Universal joint sleeve (405)
Moisten surface of coupling rod (400) and inner
surface of universal joint sleeve with joint grease
(see index for special grease).
Slip on universal joint sleeve
De-aerate interior of joint with tool/screw driver
(WS)
•
Holding band re-assembly
Mount holding band (406) using tool (W3/see Point
9) as described in document OM.HBD.01e .