Nortel Application Switch Installation Manual Download Page 40

315396-F

40

 

Mechanical Specifications

Table 19

 lists the mechanical specifications of units in the Application Switch 2000 and 3000 

Series.

Thermal Shock

0 to 40 degrees Celsius (32 to 104 
Fahrenheit) in less than 5 minutes.

-40 degrees Celsius to room 
temperature in less than 5 
minutes.

85 degrees Celsius to room 
temperature in less than 5 
minutes.

Vibration, peak to peak 
displacement

0.005 in. max (5 to 32 Hz)

0.1 in. max (5 to 17 Hz)

Vibration, peak acceleration

0.2g (3 to 200 Hz)

(Sweep Rate = 1 octave/minute)

0.2g (3 to 200 Hz)

(Sweep Rate = 1 octave/minute)

Table 19   

Mechanical Specifications

Unpackaged Operation 
Requirements

Standard Specification

Note

Operational Vibration (Sinusoidal)

3-200Hz at 0.2g peak sweep rate 1 
oct/min for 20 sweeps. Equal to 
2.15 hours, applied to 3 mutually 
perpendicular axis, for a 6.75 
hours total.

ETS 300 019-1-3 and IEC 68-2-6 
Test Fc

Shock of low significance. For 
example, slamming of doors.

Shock

3g 11ms

IEC 68-2-27

Shock of low significance.

Table 18   

Environmental Specifications (continued)

Condition

Operating Specifications

Storage Specifications

Summary of Contents for Application Switch

Page 1: ...Part No 315396 F June 2006 4655 Great America Parkway Santa Clara CA 95054 Nortel Application Switch Hardware Installation Guide...

Page 2: ...er software the rights of the United States Government regarding its use reproduction and disclosure are as set forth in the Commercial Computer Software Restricted Rights clause at FAR 52 227 19 Stat...

Page 3: ...ration of this equipment in a residential area is likely to cause harmful interference in which case users will be required to take whatever measures may be necessary to correct the interference at th...

Page 4: ...Nortel Application Switch chassis Republic of Korea only This device has been approved for use in Business applications only per the Class A requirements of the Republic of Korea Ministry of Informat...

Page 5: ...ing cables power cord AC adaptors shipped with the equipment or specified by Nortel to be used with the equipment If you use any other equipment it may cause failures malfunctioning or fire According...

Page 6: ...6 315396 F...

Page 7: ...d during switch installation and initial configuration Table 1 outlines the sections of this book Table 1 Book Sections Section Description The Application Switch This section provides a brief overvie...

Page 8: ...ortel Networks service program has been purchased for the product contact one of the following Nortel Networks Technical Solutions Centers Europe Middle East and Africa 00800 8008 9009 or 44 0 870 907...

Page 9: ...rtel com help contact global An Express Routing Code ERC is available for many Nortel Networks products and services When you use an ERC your call is routed to a technical support person who specializ...

Page 10: ...ts that are identified with an E or a DC at the end of the model name The E variant is an enhanced version which is built to conform with the European Union Environmental Directive EUED for Restrictio...

Page 11: ...Figure 4 Application Switch 2424 SSL Application Switch 2424 SSL Figure 4 on page 11 Application Switch 3408 Figure 5 on page 12 1 Note The Application Switch 2424 and 2424 SSL are identical in appear...

Page 12: ...ation holes as illustrated in Figure 6 Figure 6 Rear Panel of AC Powered Application Switch Refer to AC Power Installation Procedure on page 24 for instructions on connecting power to AC powered switc...

Page 13: ...e port configurations for Application Switch 2000 and 3000 series Application Switch 2000 Series Table 3 displays the number and numbering of Fast Ethernet and SFP GBIC ports on the Application Switch...

Page 14: ...and Small Form Factor Pluggable SFP GBIC that fits into the port socket Figure 8 SFP GBIC Port Socket and LC Connector The LC jack is used for connecting Gigabit Ethernet fiber optic segments The SFP...

Page 15: ...duplex operation Table 4 SFP Module Part Numbers Type Reach Connector Nortel Order Number 1000Base SX LC Type AA1419046 or AA1419013E5 1000Base LX LC Type AA1419047 or AA1419015E5 1000Base T 100 mete...

Page 16: ...ement Port is a Fast Ethernet port with two LEDs This port is used exclusively to manage the switch While the switch can be managed from any network port the Management Port saves consuming a port tha...

Page 17: ...the Management Port Figure 9 Management and Console Ports Table 6 Management Port Pin Assignments Pin Description 1 2 3 4 5 6 7 8 Tx Tx Rx Not used Not used Rx Not used Not used 1 Note The Management...

Page 18: ...onsole Port connection LEDs The Application Switch has two LEDs for each FE port embedded into the RJ 45 connectors There is one LED for each SFP GBIC port and two LEDs for the Management Port The LED...

Page 19: ...Link is Active Link is Inactive Data is being processed SFP GBIC Ports LED On Green Off Blinking Green Link is Active Link is Inactive Data is being processed Management Port Left LED Right LED On Gre...

Page 20: ...Unless otherwise specified by the customer the AC powered Application Switch is shipped with two AC power cords one for North America and one for Europe Table 8 contains a listing of order numbers for...

Page 21: ...the switch 7 Powering on the switch Table 8 Regional Power Cord Order Numbers Region Order Number United Kingdom and Ireland 7917 United Kingdom and Ireland EUED RoHS Compliant 7917E6 Japan 7918 Aust...

Page 22: ...ing process for both types of units 1 Connect the two mounting brackets to the switch using the supplied screws Mounting brackets can be attached at mid mount position or faceplate mount depending upo...

Page 23: ...23 Figure 13 Mounting Brackets for Nortel Application Switch 2 Install the switch as shown in Figure 14 using the appropriate screws for the rack mount system four 10 32 12 24 M5X 8 6H or M6X1 6H type...

Page 24: ...to the On position Warning Please be careful of the following while installing the equipment Please only use the Connecting cables power cord AC adaptors shipped with the equipment or specified by Nor...

Page 25: ...C earth ground lead to the switch earth ground terminal Loosen the 6 32 nut from the stud of the switch earth ground terminal and remove the ring terminal that is provided with the unit Strip half a c...

Page 26: ...DC power lead into the ring terminals provided 8 Connect each of the DC power leads to the appropriate polarized terminal on the switch Take the following steps to connect the DC power leads Install t...

Page 27: ...port connecting at 1000 Mbps All 10 100 Mbps FE ports auto negotiate and support half and full duplex operation Each SFP GBIC port on the Application Switch has transmit and receive ports The transmi...

Page 28: ...egments to the port The port LEDs light up to indicate the various port connection conditions See Table 7 on page 19 for details Connecting Cables to Console Port To establish a console DCE connection...

Page 29: ...ated Documentation on page 8 and that were shipped in the software kit of this product The software provides the following A built in text based command line interface CLI and menu system for switch c...

Page 30: ...g a Console Connection Use the following procedure to establish a console connection with the switch 1 Connect the terminal or computer running terminal emulation software to the Console Port of the s...

Page 31: ...network BOOTP server or manually during the switch configuration process Establishing an SSH Connection Although a remote network administrator can manage the configuration of an Application Switch th...

Page 32: ...6 MAC Address 00 11 f9 cb cf 00 IP If 1 Address 0 0 0 0 Hardware Order No EB1412027 Mainboard Hardware Part No P315790 B Rev 04 Management Processor Board Hardware Part No P314080 B Rev 02 Gig Etherne...

Page 33: ...Order No EB1412028 Serial No SSCPL202N1 Rev 12 Mainboard Hardware Part No P315720 B Rev 04 Management Processor Board Hardware Part No P314080 B Rev 02 Fast Ethernet Board Hardware Part No P314091 B...

Page 34: ...stablish connections between the switch and the server with the help of the network ports using connectors and cables Apart from establishing a Layer 2 link network data ports can also be used to mana...

Page 35: ...tion about port configuration setting speed and mode The CLI command prompt does not appear after the establishment of a switch connection through the console Telnet or SSH The operating system may ha...

Page 36: ...stops during switch operation contact Nortel Networks customer support Remember that units in a closed or multi unit rack assembly may have an operating ambient temperature higher than the ambient te...

Page 37: ...w Spanning Tree Protocol IEEE 802 1d Logical Link Control IEEE 802 2 10Base T 100Base TX IEEE 802 3 802 3u 1000Base SX IEEE 802 3z Flow Control IEEE 802 3x Link Negotiation IEEE 802 3z Frame Tagging I...

Page 38: ...m Distance 10BaseT RJ 45 UTP Cat 3 4 or 5 100 meters 325 feet 100BaseTX RJ 45 UTP Cat 5 100 meters 325 feet 10 100 1000BaseT RJ 45 UTP Cat 5e or 6 is recommended The cabling must meet ANSI TIA EIA 568...

Page 39: ...nt to 512 BTU hour thermal dissipation Typical power consumption 115 Watts at 25 degrees Celsius Table 17 DC Power Specifications Specifications Measurement Auto ranging power supply 40 to 75 VDC 4 Am...

Page 40: ...ion peak acceleration 0 2g 3 to 200 Hz Sweep Rate 1 octave minute 0 2g 3 to 200 Hz Sweep Rate 1 octave minute Table 19 Mechanical Specifications Unpackaged Operation Requirements Standard Specificatio...

Page 41: ...Electromagnetic Requirements CISPR 22 Class A and CISPR24 International FCC PArt 15 Subpart B Class A USA ICES 003 Class A Canada EN55022 Class A Europe EN55024 with EN61000 Europe AS NZS CISPR 22 Cla...

Page 42: ...Benutzer die erforderlichen Ma nahmen zur Beseitigung ergreifen Attention Ce p riph rique est un produit de classe A Il peut provoquer des interf rences radio dans un environnement domestique si tel e...

Page 43: ...eeignet Attention si vous installez le module dans une baie ne l empilez pas directement sur un autre Chaque module doit tre fix sa propre baie l aide des supports de montage appropri s Ces supports n...

Page 44: ...de mise la terre Sans mise la terre adapt e vous risquez de recevoir une d charge lectrique en touchant le commutateur Par ailleurs l absence de trajet de mise la terre peut g n rer des missions exce...

Page 45: ...laser ou infrarouges qui risquent d entra ner des l sions oculaires Ne jamais regarder dans le port d un connecteur ou d un c ble fibre optique Toujours supposer que les c bles fibre optique sont rac...

Page 46: ...315396 F 46...

Page 47: ...useinander oder laden Sie neu Precauci n Este producto contiene una bater a del litio Las bater as no son piezas reemplazables del cliente Pueden estallar si est n manejadas mal No disponga de la bate...

Page 48: ...315396 F 48...

Reviews: