Nortel Application Switch Hardware Installation Guide
21
.
Installation Preparation
Switch installation involves the following tasks:
1
Choosing a suitable location to install the switch.
2
Unpacking the switch from the box.
3
Turning the power switch to the Off (O) position.
4
Mounting the switch.
5
Connecting the power inlet of the switch to the appropriate power source. Refer to
“AC Power
Installation Procedure” on page 24
and
“DC Power Installation Procedure” on page 25
for
detailed information on completing this task.
6
Connecting network cables to the switch.
7
Powering on the switch.
Table 8
Regional Power Cord Order Numbers
Region
Order Number
United Kingdom and Ireland
7917
United Kingdom and Ireland EUED
RoHS Compliant
7917E6
Japan
7918
Australia, New Zealand, and the
People’s Republic of China
7910
1
Caution:
Observe the following precautions when selecting a site and installing the
switch:
•
For proper air circulation, the vents on the front, back, and sides of the switch should not be
blocked or obstructed by cables, panels, rack frames, or other materials.
•
When mounting this device in a rack, do not stack units directly on top of one another in the rack.
Each unit must be secured to the rack with appropriate mounting brackets. Mounting brackets
are not designed to support multiple units.