60
Chapter 4 Installing option cards and DIMMs
NN46110-311 02.01
Shutting down the system to add or replace hardware
To install or replace an option card or a DIMM, you must first shut down the VPN
Router 2700 and unplug it.
To shut down the VPN Router 2700:
1
Use the Web GUI or the command line interface (CLI) to shut down the
gateway.
•
Web GUI: Choose Admin > Shutdown. Select the option to power off the
gateway after shutdown.
•
CLI: Use the
reload
command to shut down the system. For example,
enter
reload power-off disable-logins “Upgrade hardware”
For the complete syntax of the
reload
command, see the
Nortel VPN
Router Using the Command Line Interface
(NN46110-507).
2
Wait for the system to shut down.
3
Disconnect the power cord from the power outlet, and then disconnect the
cord from the VPN Router 2700.
The power receptacle is on the rear of the VPN Router 2700.
Warning:
Risk of electric shock
Shut down the VPN Router 2700 as described in this section before you
attempt to add or replace an option card or DIMM.
Warning:
Risk of electric shock
Turn off the VPN Router 2700, and unplug the power cord before you
attempt to remove or install an option card or DIMM.
Summary of Contents for 2700
Page 6: ...6 NN46110 311 02 01 ...
Page 10: ...10 Contents NN46110 311 02 01 ...
Page 16: ...16 New in this release NN46110 311 02 01 ...
Page 20: ...20 How to get help NN46110 311 02 01 ...
Page 34: ...34 Chapter 1 Installing the Nortel VPN Router 2700 chassis NN46110 311 02 01 ...
Page 74: ...74 Chapter 4 Installing option cards and DIMMs NN46110 311 02 01 ...
Page 102: ...102 Appendix A Technical specifications NN46110 311 02 01 ...