Chapter 2 Cabling the VPN Router and turning the power on
39
Nortel VPN Router Installation — VPN Router 2700
Verifying a successful installation
After you connect the gateway to the power source and turn it on, you can verify a
successful installation by checking the LEDs on the front panel (
Figure 8 on
page 40
).
The following sequence of LEDs occurs:
1
The power LED (the Nortel Networks logo) lights blue.
2
As the gateway boots, the Boot/Ready LED lights yellow.
3
When the boot process is complete, the Boot/Ready LED lights green,
indicating that the gateway is operational.
4
The Alert/Fail LED lights yellow because the gateway is not configured.
For a newly installed VPN Router 2700, a yellow Alert/Fail LED does not
indicate an alarm condition. After you configure the management IP address
on the gateway, the Alert/Fail LED turns off. (See
Chapter 3, “Configuring
the management IP interface,” on page 51
.)
If the LEDs on the front panel light in this sequence, your installation is
successful. If the LEDs do not light in this sequence, check that the bezel is on the
gateway and that the power cord is properly attached to the power supply (see
“Connecting the power cord” on page 38
).
If the VPN Router 2700 still does not boot, contact your local Nortel Technical
Solutions Center (see
“How to get help” on page 17
).
Summary of Contents for 2700
Page 6: ...6 NN46110 311 02 01 ...
Page 10: ...10 Contents NN46110 311 02 01 ...
Page 16: ...16 New in this release NN46110 311 02 01 ...
Page 20: ...20 How to get help NN46110 311 02 01 ...
Page 34: ...34 Chapter 1 Installing the Nortel VPN Router 2700 chassis NN46110 311 02 01 ...
Page 74: ...74 Chapter 4 Installing option cards and DIMMs NN46110 311 02 01 ...
Page 102: ...102 Appendix A Technical specifications NN46110 311 02 01 ...