background image

Doc No. 700016  Page 2 of 16 

 

Document Index. 

1   Installation Requirements 

1.1 Health & Safety 
1.2 Model Definitions 
 

2   Assembly Instructions 

2.1 Tools Required 
2.2 Assembly Notes 

2.2.1 Turbulators 
2.2.2 Brackets 
2.2.3 Tube Alignment Sections 
2.2.4 Couplers 
2.2.5 Reflectors 
2.2.6 Burner/Heat Exchanger Assembly 

2.3 Identification Check List 
2.4 Prior to Assembly 

2.5 Step by Step Installation 

2.5.1 Tubes and Turbulators 
2.5.2 Brackets, U Bolts and U Bend 
2.5.3 Reflectors 
2.5.4 End Caps 
2.5.5 Canopies 
2.5.6 Canopy End Caps 
2.5.7 General 

2.6 Detailed Assembly Drawings 

 

3   User and Operating Instructions 

3.3 To Start Heater 
3.2 To Switch off Heater 
3.3 Routine Maintenance Between Service Intervals 
3.4 Frequency of Servicing 

1. Installation 

Requirements. 

Isolate any electrical supply to the 
heater and controller before proceeding. 

Practice by a qualified installer. Isolate all 

 

 

 

electrical supplies to the heater & controller   
before proceeding.  
 
For your own safety we  recommend the use of 
safety boots and leather faced gloves when 
handling sharp or heavy items. The use of    
protective eye wear is also recommended. 
 
 

1.2 Model 

Definitions 

 
VSXUT 

= Ambirad Vision High efficiency U 

Tube  heater with painted powered burner, deep 
profile stainless steel reflector and end caps, 
reflector canopy and end caps in Aluzink. 

1.1  Health and Safety 
 

Nortek  gas  fired  heaters  must  be  installed  in           
accordance with the relevant provisions of the 
Gas Safety (Installations and Use) Regulations 
1998. Due account should also be taken of any 
obligations arising from the Health and Safety 
at Works Act 1974 or relevant codes of 

 

 

 

 

 

 

practice. In addition the installation must be 
carried out in accordance with the current IEE 
wiring regulations (BS 7671), BS 6896 
(Industrial & Commercial) and any other 

 

 

 

 

 

relevant British Standards and Codes of 

 

 

 

 

 

Introduction. 

and attention is required to ensure that working 
at height regulations are adhered to at the 
mounting heights specified. 

 

PLEASE READ 

this document prior to 

 

installation to familiarise yourself with the 

components and tools you require at the various 
stages of assembly. 

 
All  Dimensions  shown  are  in  mm  unless        
otherwise stated. 
 

The manufacturer reserves the right to alter 
specifications without prior notice.

 

Welcome to the range of high efficiency 
AmbiRad Vision radiant tube heaters. Local 
regulations may vary in the country of use and 
it is the installers responsibility to ensure that 
such regulations are satisfied. 
 
All installation, assembly, commissioning and 
service procedures must be carried out by   
suitable qualified competent persons to the 
statutory regulations in the country of use. 
 
When assembling, installing, commissioning 
and servicing is undertaken on radiant tube 
heaters specified in these instructions, due care 

Summary of Contents for Ambirad Vision VSX

Page 1: ...s Act 1974 or relevant codes of practice In addition the installation must be carried out in accordance with the current IEE wiring regulations BS 7671 BS 6896 Industrial Commercial and any other rele...

Page 2: ...canopy and end caps in Aluzink 1 1 Health and Safety Nortek gas fired heaters must be installed in accordance with the relevant provisions of the Gas Safety Installations and Use Regulations 1998 Due...

Page 3: ...o complete the tasks laid out in this manual Pozidrive Screwdriver Trestles Leather Faced Gloves Tape Measure Spanner Set 4 5mm Allen keys 2 2 4 Reflectors All reflectors AND canopies must be position...

Page 4: ...6x 2 3 Identification check list 2x 1x 1x 1x 4x 4x 5x 2x 2x 4x 3x 4x 10x M8 Full Nut 16x 22x 28x No 5 Torque Screw 13x 14x 15x Turbulators 2 2 6 Burner and Heat Exchanger Assembly Slide the burner ass...

Page 5: ...5 VSX4M 45 50 M4 Full Nut 1x 2x M6 Washer M6 Full Nut M6 x 35 Setpin M4 Washer M6 x 15 Setpin 6x 10x 6x 4x 6x 4x 7x 2x 8x 4x 8x 14x 8x 3x 9x 6x 2 4 Prior to assembly Ensure the area in which you are w...

Page 6: ...for location length 3 CAUTION SHARP EDGES 2x 3x 3x 5x Working at the opposite ends of the tubes to the burner locate position two couplers so that the socket heads are facing outwards the pre fitted...

Page 7: ...nd bracket 2 5 3 Reflectors 2x 3x 7 CAUTION SHARP EDGES Slide end reflector so that the innermost slotted holes line up with 1st bracket fixing holes then fix in place using M6 x 35mm pins washers nut...

Page 8: ...g outwards 3x 3x 3x 3x 1x 2x 1x 2x 12 13 3x 3x 3x 3x 2x 2x 11 3x 3x 3x 3x 3x 2x 3x 3x 2 5 5 Canopies Remove protective film before starting Slide the outer canopies over the reflectors from the U bend...

Page 9: ...ofile at the U bend end fix with screws Repeat procedure for cut out canopy end cap again ensuring the flange faces inwards 2 5 6 Canopy End Caps 16 2x 2x 12x 12x CAUTION SHARP EDGES 17 1x 1x 1x 1x 2...

Page 10: ...700016 Page 10 of 16 Figure 1 VSX2M 20 25 30 2600mm 20kW ONLY 3400mm 25 30KW TURBULATORS 976mm TURBULATOR COUPLER 1365mm 1650mm 50 mm O LAP 50mm O LAP 38mm 150 4047mm REFERENCE 3400mm TUBE Y Z X Z Z...

Page 11: ...of 16 Figure 2 VSX3M 30 35 40 45 5927mm REFERENCE 50mm O LAP 50mm O LAP 50mm O LAP 50mm O LAP COUPLER 138mm 5200mm TUBE 1365mm 976mm TURBULATOR 2600mm TURBULATOR 150 2600mm TURBULATOR 1880mm 1650mm Y...

Page 12: ...90mm REFERENCE 50mm O LAP COUPLER 976mm TURBULATOR 1200mm 50mm O LAP 50mm O LAP 50mm O LAP 50mm O LAP 50mm O LAP 293mm 1880mm 1880mm 1650mm 150 COUPLER 3400mm TURBULATOR 3400mm TURBULATOR 50kW ONLY 52...

Page 13: ...Doc No 700016 Page 13 of 16 Figure 4 VSX Heater Breakdown 3 module shown...

Page 14: ...Doc No 700016 Page 14 of 16 Notes...

Page 15: ...Doc No 700016 Page 15 of 16 Notes...

Page 16: ...cold and mains electric isolated cleaning of the reflectors with a soft cloth and a mild detergent non solvent based cleaners only in water can be undertaken Additional removal of dust from the radia...

Reviews: