background image

4 E2 Service Manual

MODEL IDENTIFICATION CODE

E 2 EB - 010 H - A

Electrical Code
H - 240-1-60

Product Type

E -Electric Furnace

Primary Capacity
010 - 10 kw
012 - 12 kw
015 - 15 kw
017 - 17 kw
020 - 20 kw
023 - 23 kw

Generation

2 - Second Series

Options
A -A/C Ready

Product Identifier
EH - Heat Only
EB - A/C Blower Equipped

Year

9705

01234

Month

Design Series

E

E

Manufacured Housing

Electric

2

SERIAL NUMBER IDENTIFICATION CODE

Production Code

General

E2 series electric furnaces are approved for use in
mobile/modular homes.  The E2 series furnaces are
approved for downflow and upflow installations as free
standing units, or for alcove installations.  All furnaces
models are approved for “zero” inch clearance from
combustible materials. For downflow alcove
installations a grille with frame may be attached to the
top of the furnace and all paneling and trim flushed to
it.

This installations provides an access door for future
installation of an air conditioning/heat pump coil.  All E2
series furnaces are A/C, heat pump adaptable. Refer to
table 2 For optional air conditioner/ heat pump
equipment.  The E2 series includes two models:  E2EH
and E2EB models. The E2EH models are equipped
with  a two speed blower and require the addition of a
replay package for the addition of air conditioning or
heat pump.  The E2EB furnaces are equipped with a
multi-speed (4-speed) blower, blower  relay, and cabinet
insulation.

1. Heating output rated at listed voltage. For outputs at voltages other than 240V, multiply Btuh rating by the following factors: x 0.92 (230V), x 0.84 (220V), x 0.75 (208V)
2. Height is 56" with return air grille installed, 58" with coil cabinet and 72" with coil cabinet and upflow stand.
3. The factory installed blower for the EH models can be replaced with a multi-speed blower allowing the units to accept up to 4 or 5 tons of air conditioning or heat pump.
4. The factory installed blower for the EB models can be replaced with a multi-speed blower allowing the units to accept up to 5 tons of air conditioning or heat pump.

Table 1.  Unit Specifications

Electric Furnace Models

E2EH

E2EB

010H

012H

015H

017H

020H

023H

010H

012H

015H

017H

020H

023H

Rated Heating Output, Btuh  (see note1) 35,000

41,000

53,000

57,000

70,000

75,000

35,000

41,000

53,000

57,000

70,000

75,000

Watts (Total kw, Heating Elements and 

Blower)

10.4

12.0

15.4

16.6

20.4

22.0

10.4

12.0

15.4

16.6

20.4

22.0

Supply Voltage

             240/208 Volts/60Hz/1-Phase

Heating Elements, No.(Total kw) 2 (10.0) 2 (11.6) 3 (15.0) 3 (16.2) 4 (20.0) 4 (21.6) 2 (10.0) 2 (11.6) 3 (15.0) 3 (16.2) 4 (20.0) 4 (21.6)

Blower:

                         Wheel Size

10.5" Dia., 8" Wide

10.5" Dia., 8" Wide

Motor Speeds, H.P. Rating, Amps

2 Speed, 1/5 Hp, 2.0 Amps

4 Speed, 1/3 Hp, 2.9 Amps

Test ESP, in. w.c. Max

0.3

Optional Cooling Available with factory
installed blower

      2.0 - 3.0 ton (see note 3)

2.0 - 4.0 ton (see note 4)

Optional Heat Pump

Available

with

factory installed blower

      2.0 - 3.0 ton (see note 3)

n/a (see note 3)

2.0 - 4.0 ton (see note 4)

Air Filter (Standard)

16" x 20" x 1" (nominal)

Furnace Dimensions

Width - 20"  (508 mm) Height - 29" (737  mm) ( see note 2)    Depth - 24-1/2"  (623 mm)

Summary of Contents for E2EB 010H

Page 1: ...E2 Series Electric Furnaces Service Manual ...

Page 2: ......

Page 3: ...Model Identification Code 4 Serial Number Identification Code 4 Selecting Blower Speeds 11 Blower Performance 12 Changing Blower Speeds 11 Service Diagrams 21 4 7 Wire Relay Box for H P E2EB 020 and 023 Units 23 2 Wire Relay Box for A C E2EH 020 and 023 Units 21 4 7 Wire Relay Box for H P E2EH 020 and 023 Units 22 Thermostat Sequence of Operation 12 Wiring Diagrams 13 E2EB 010 17 E2EB 012 18 E2EB ...

Page 4: ...tratedatlistedvoltage Foroutputsatvoltagesotherthan240V multiplyBtuhratingbythefollowingfactors x0 92 230V x0 84 220V x0 75 208V 2 Height is 56 with return air grille installed 58 with coil cabinet and 72 with coil cabinet and upflow stand 3 The factory installed blower for the EH models can be replaced with a multi speed blower allowing the units to accept up to 4 or 5 tons of air conditioning or...

Page 5: ...1 element and the blowermotor Astheheatercontinuestobuildupheat the bi metal closes the remaining circuits to other elements until all elements are on The off cycle is reverse of the on cycle the blower and no 1 element are first on and the last to be de energized Table 2 Optional Air Conditioning and Heat Pump Equipment Item Number See Fig 1 Description 1 4 Speed Blower 4 Ton See Notes 1 5 5 Ton ...

Page 6: ...be 70 to 90 ohms of resistance If the meter reads no continuity the bi metal heater is open and must be replaced The OHMS value should be 70 to 90 across the bi metal Figure 2 Sequencer c With an ohmeter check all switches in the sequencer They are labled M1 M2 M3 M4 refertoFigure2 Alloftheswitchesshould be open and have no continuity 2 With all power on to furnace and thermostat contacts closed u...

Page 7: ...e replaced Caution Heating elements must always be replaced byanidenticalkWreplacement Substitutionbyhigher kW s or elements of a different design may result in unsafe operation of the furnace Lower kW rated elements will reduce output and may result in unsatisfactory operation of the appliance Refer to element rating labels and furnace wiring diagrams Refer to unit wiring diagram section for wiri...

Page 8: ...metal disc to open a set of normally closed contacts The limit device is a safety which can be compared to a fuse or a breaker in a electrical circuit The function of the limit switch is to open the electrical circuit to the heating elements if over heating should occur This could be caused by air circulator failure dirty filters lackofreturnair restrictedducts etc Alllimitswitches used are of the...

Page 9: ...eiscontinuity the motor is grounded and should be replaced 4 Using the ohmmeter check the resistance across the motor leads See diagrams below Note the higher the speed the lower the resistance of the motor winding Figure 11 Blower Figure 9 Fan Switch Shematic Figure 12 Motor Schematic Checking the Air Circulator Selector Switch Tochecktheaircirculatorswitchshutofallpowertothe furnace Remove wires...

Page 10: ...onnecting Supply Service Wires 1 Remove right hand control panel when viewing in downflow position 2 Locate power supply hole plugs in side of unit and in bottom of unit Remove appropriate plug s or knockoutopeningapplicabletorecommendedwire size s 3 Install listed cable connector s in opening s If metal sheathedconduitisusedforincomingpower line s provideanapprovedmetalclamponconduit and secure i...

Page 11: ...yorpropertydamage make certain that the motor leads cannot come into contact with non insulated metal components of the unit See Table 4 for the lowest speed approved for the heating output of the unit Since the blower leads connect to the controlbox blowerspeedselectionisaccomplishedthrough use of the proper color coded blower lead located inside the controlbox Thespeed s setbythefactorymaybediff...

Page 12: ...nd set ventilate switch to AUTO Cooling system and air circulator blower should turn on 3 Check air temperature at supply duct registers 4 Move temperature setting lever until left hand cooling contacts open Cooling system and air circulator blower should turn off 5 Replace thermostat cover For Continuous Air Circulation and Ventilation NOTE ForCM65 seefurnaceowner smanualonindepen dent blower ope...

Page 13: ...13 E2 Service Manual Figure 15 E2EH 010 Wiring Diagram ...

Page 14: ...14 E2 Service Manual Figure 16 E2EH 012 Wiring Diagram ...

Page 15: ...15 E2 Service Manual Figure 17 E2EH 015 017 Wiring Diagram ...

Page 16: ...16 E2 Service Manual Figure 18 E2EH 020 023 Wiring Diagram ...

Page 17: ...17 E2 Service Manual Figure 19 E2EB 010 Wiring Diagrams ...

Page 18: ...18 E2 Service Manual Figure 20 E2EB 012 Wiring Diagram ...

Page 19: ...19 E2 Service Manual Figure 21 E2EB 015 017 Wiring Diagram ...

Page 20: ...20 E2 Service Manual Figure 22 E2EB 020 023 Wiring Diagram ...

Page 21: ...21 E2 Service Manual Figure 23 Two Wire Relay Box for A C E2EH 020 and 023 Units ...

Page 22: ...22 E2 Service Manual Figure 24 4 7 Wire Relay Box for H P E2EH 020 and 023 Units ...

Page 23: ...23 E2 Service Manual Figure 25 4 7 Wire Relay Box for H P E2EB 020 and 023 Units Part 1 ...

Page 24: ...24 E2 Service Manual Figure 26 4 7 Wire Relay Box for H P E2EB 020 and 023 Units Part 2 ...

Page 25: ...____________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ ___________________________________________...

Page 26: ...______________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _________________________________...

Page 27: ......

Page 28: ...St Louis MO 359A 1097 Specifications and illustrations subject to change without notice and without incurring obligations Printed in U S A 10 97 R R ...

Reviews: