5-Jul-2022
Page 16
002596MAN-01
Routine Maintenance
MAINTENANCE SCHEDULE
Item
Interval
Procedure
Air Filter
6 months
Inspect for dirt. Replace if necessary.
Condensate
Drain
1 year
Inspect for clogs. Clean if necessary.
Water to Air
Heat Exchanger
Fin contamination:
Inspect outside surface of fins for dirt that has gotten
by air filter, perhaps due to not changing filter at rec-
ommended interval. Clean using cleaning solution or
high pressure water or air.
Hydronic circuit fouling:
Disconnect the hydronic loop and flush heat ex-
changer with a calcium removing solution. Generally
not required for closed loop or cold water open loop
systems; whenever system performance is reduced
for warm water open loop systems (unusual).
When experiencing
performance degrada-
tion that is not ex-
plained by low airflow
Summary of Contents for AH4P Series
Page 10: ...5 Jul 2022 Page 10 002596MAN 01 ...
Page 26: ...5 Jul 2022 Page 26 002596MAN 01 Wiring Diagram 24VAC Airflow Control ...
Page 27: ...5 Jul 2022 Page 27 002596MAN 01 Wiring Diagram VSP models 0 10VDC Airflow Control ...
Page 28: ...5 Jul 2022 Page 28 002596MAN 01 Dimensions AHW 65 Horizontal Dimensions AHW 65 Vertical ...
Page 29: ...5 Jul 2022 Page 29 002596MAN 01 Dimensions AH4P 65 Horizontal Dimensions AH4P 65 Vertical ...